Skip to content

Turbo 1

Bonaparte, Northern Territory

Turbo 1 is a petroleum well in the Bonaparte, Northern Territory, operated by Japex, drilled to a total depth of 3,900 m.

Request LAS Files & Well Summary

Well Information

Well Name
Turbo 1
Basin
Bonaparte
State
Northern Territory
Classification
FEST
Operator
Japex
Driller
Diamond
Data Summary
Partial WDS Available

Drilling Data

Total Depth
3,900 m
Datum Elevation
25.0 m
Spud Date
26/06/2000
Completion Date
03/09/2000
Permit
NT AC P 29

Location

Latitude
-12.8074
Longitude
123.5124

Available Log Data

4
Log Streams
67
Curves
645,800
Data Points
150,937
Metres

Borehole Geometry (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEVI 2568 m 3229 m 661 m
HAZI 2568 m 3229 m 661 m

Caliper (5 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
C1 2605 m 3232 m 627 m
C2 2605 m 3232 m 627 m
CALI 2605 m 3238 m 633 m
CALS 2559 m 3243 m 684 m
HDAR 2605 m 3232 m 627 m

Chromato (13 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CO2 642 m 3900 m 3258 m
ETH 642 m 3900 m 3258 m
FLOW 325 m 3900 m 3575 m
H2S 642 m 3900 m 3258 m
IBUT 642 m 3900 m 3258 m
IPEN 642 m 3900 m 3258 m
MDOU 325 m 3900 m 3575 m
METH 642 m 3900 m 3258 m
MTIN 325 m 3900 m 3575 m
MTOU 325 m 3900 m 3575 m
NBUT 642 m 3900 m 3258 m
NPEN 642 m 3900 m 3258 m
PROP 642 m 3900 m 3258 m

Density (3 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 2607 m 3238 m 631 m
PEF 2607 m 3238 m 631 m
RHOB 2607 m 3238 m 631 m

Dip and Scan (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DDA 2607 m 3227 m 619 m
DDIP 2607 m 3227 m 619 m

GR (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR 2537 m 3236 m 699 m
GR 2560 m 3217 m 657 m
GR1 2569 m 3230 m 661 m
GR2 2536 m 3229 m 693 m
SGRC 600 m 3886 m 3285 m

Miscellaneous (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITD 325 m 3900 m 3575 m
DEPT 598 m 3899 m 3301 m
DEPT 2535 m 3243 m 708 m
DEPT 642 m 3900 m 3258 m
DEPT 325 m 3900 m 3575 m

Mudlog (14 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITT 325 m 3900 m 3575 m
DXC 325 m 3900 m 3575 m
LAGD 325 m 3900 m 3575 m
MDIN 325 m 3900 m 3575 m
PITV 325 m 3900 m 3575 m
ROP 325 m 3900 m 3575 m
RPM 325 m 3900 m 3575 m
SPP 325 m 3900 m 3575 m
SROP 640 m 3899 m 3259 m
TGAS 642 m 3900 m 3258 m
TORQ 325 m 3900 m 3575 m
TQMX 325 m 3900 m 3575 m
TREV 325 m 3900 m 3575 m
WOB 325 m 3900 m 3575 m

Neutron (2 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NPHI 2535 m 3238 m 703 m
TNPH 2535 m 3229 m 694 m

Resistivity (13 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
KRX0 2607 m 3222 m 615 m
LLD 2607 m 3232 m 625 m
LLS 2607 m 3232 m 625 m
MSFC 2607 m 3222 m 615 m
SDDE 598 m 3887 m 3289 m
SEDP 631 m 3887 m 3256 m
SEMP 631 m 3887 m 3256 m
SESP 631 m 3887 m 3256 m
SEXP 631 m 3887 m 3256 m
SFXE 639 m 3887 m 3247 m
SMIN 2607 m 3222 m 615 m
SMNO 2607 m 3222 m 615 m
STEM 598 m 3887 m 3289 m

Sonic (2 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 2605 m 3232 m 627 m
DTL 2605 m 3232 m 627 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 2607 m 3212 m 605 m