Myall Creek 8
Myall Creek 8 is a petroleum well in the Bowen, Queensland, operated by OCA, drilled to a total depth of 2,077 m.
Well Information
Drilling Data
- Total Depth
- 2,077 m
- Datum Elevation
- 250.5 m
- Spud Date
- 08/12/2002
- Completion Date
- 09/01/2003
- Permit
- PL 174
- Rig
- Rig 1
Location
- Latitude
- -27.0617
- Longitude
- 149.2200
Available Log Data
Borehole Geometry (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| CADF | 210 m | 2026 m | 1816 m |
Caliper (3 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALY | 1975 m | 2068 m | 93 m |
| CALY | 2011 m | 2069 m | 58 m |
| CAPD | 2010 m | 2075 m | 65 m |
Chromato (7 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ETHA | 221 m | 2076 m | 1855 m |
| IBUT | 221 m | 2076 m | 1855 m |
| IPEN | 221 m | 2076 m | 1855 m |
| METH | 221 m | 2076 m | 1855 m |
| NBUT | 221 m | 2076 m | 1855 m |
| NPEN | 221 m | 2076 m | 1855 m |
| PROP | 221 m | 2076 m | 1855 m |
Density (4 curves)
Bulk density measurements for porosity calculation and lithology identification.
| Curve | Start | End | Interval |
|---|---|---|---|
| DCOR | 2011 m | 2076 m | 65 m |
| DEN | 2011 m | 2076 m | 65 m |
| PEDF | 2010 m | 2076 m | 65 m |
| PEDN | 2011 m | 2076 m | 65 m |
GR (11 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GCGR | 2005 m | 2069 m | 64 m |
| GRDI | 1979 m | 2072 m | 93 m |
| GRLL | 8 m | 2024 m | 2016 m |
| GRPD | 2005 m | 2070 m | 65 m |
| GRPO | 2004 m | 2076 m | 72 m |
| GRSG | 2004 m | 2069 m | 64 m |
| GRTH | 2004 m | 2076 m | 72 m |
| GRUR | 2004 m | 2076 m | 72 m |
| RAKT | 2005 m | 2076 m | 71 m |
| RAKU | 2005 m | 2076 m | 71 m |
| RAUT | 2005 m | 2076 m | 71 m |
Logging Parameters (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| SMTU | 1983 m | 2076 m | 92 m |
Miscellaneous (5 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPTH | 8 m | 2026 m | 2018 m |
| DEPTH | 221 m | 2076 m | 1855 m |
| DEPTH | 1975 m | 2076 m | 101 m |
| DEPTH | 2004 m | 2077 m | 73 m |
| MFIN | 221 m | 2076 m | 1855 m |
Mudlog (6 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| BIT | 2004 m | 2077 m | 73 m |
| ROP | 221 m | 2076 m | 1855 m |
| RPM | 221 m | 2076 m | 1855 m |
| TGAS | 221 m | 2076 m | 1855 m |
| TORQ | 221 m | 2076 m | 1855 m |
| WOB | 221 m | 2076 m | 1855 m |
Neutron (1 curves)
Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.
| Curve | Start | End | Interval |
|---|---|---|---|
| NPRL | 2008 m | 2073 m | 65 m |
Resistivity (9 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| BHTF | 2011 m | 2076 m | 65 m |
| DLL | 221 m | 2022 m | 1801 m |
| MINV | 221 m | 2026 m | 1805 m |
| MLL | 221 m | 2026 m | 1805 m |
| MNOR | 221 m | 2026 m | 1805 m |
| RILD | 1984 m | 2074 m | 90 m |
| RILM | 1984 m | 2074 m | 90 m |
| SLL | 221 m | 2022 m | 1801 m |
| TEXD | 1983 m | 2076 m | 92 m |
Sonic (1 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DTCM | 210 m | 2016 m | 1806 m |
SP (1 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SPLL | 221 m | 2008 m | 1786 m |