Barramundi 1
Barramundi 1 is a petroleum well in the Bass, Tasmania, operated by Globex, drilled to a total depth of 2,100 m.
Well Information
Drilling Data
- Total Depth
- 2,100 m
- Datum Elevation
- 25.9 m
- Spud Date
- 15/09/1999
- Completion Date
- 29/09/1999
- Permit
- T-27-P
- Rig
- Sedco 702
Location
- Latitude
- -39.6617
- Longitude
- 145.7341
Available Log Data
Borehole Geometry (2 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEVI | 1272 m | 2096 m | 824 m |
| HAZI | 1272 m | 2096 m | 824 m |
Caliper (4 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| C1 | 1272 m | 2096 m | 824 m |
| C2 | 1272 m | 2096 m | 824 m |
| HDAR | 1272 m | 2096 m | 824 m |
| HDAR | 868 m | 2077 m | 1209 m |
Chromato (5 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| BUTA | 1884 m | 2097 m | 212 m |
| ETHA | 913 m | 2097 m | 1183 m |
| METHA | 875 m | 2097 m | 1222 m |
| PENT | 2019 m | 2097 m | 78 m |
| PROP | 1649 m | 2097 m | 447 m |
Density (3 curves)
Bulk density measurements for porosity calculation and lithology identification.
| Curve | Start | End | Interval |
|---|---|---|---|
| HDRA | 871 m | 2079 m | 1208 m |
| PEFZ | 871 m | 2077 m | 1206 m |
| RHOZ | 871 m | 2077 m | 1206 m |
Dip and Scan (2 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DDA | 1274 m | 2094 m | 819 m |
| DDIP | 1274 m | 2094 m | 819 m |
GR (8 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| CGR | 124 m | 2068 m | 1944 m |
| GR | 1272 m | 2096 m | 824 m |
| GR | 120 m | 2071 m | 1951 m |
| HGR | 120 m | 2071 m | 1951 m |
| POTA | 124 m | 2068 m | 1944 m |
| SGR | 124 m | 2068 m | 1944 m |
| THOR | 124 m | 2068 m | 1944 m |
| URAN | 124 m | 2068 m | 1944 m |
Miscellaneous (5 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPT | 1272 m | 2096 m | 824 m |
| DEPT | 784 m | 2099 m | 1315 m |
| DEPT | 120 m | 2099 m | 1979 m |
| SW | 852 m | 2099 m | 1247 m |
| VCL | 852 m | 2099 m | 1247 m |
Mudlog (2 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ROP | 784 m | 2099 m | 1315 m |
| TGAS | 877 m | 2098 m | 1220 m |
Neutron (3 curves)
Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.
| Curve | Start | End | Interval |
|---|---|---|---|
| NPHI | 120 m | 2073 m | 1953 m |
| PHIE | 852 m | 2099 m | 1247 m |
| TNPH | 120 m | 2073 m | 1953 m |
Resistivity (11 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| HART | 871 m | 2093 m | 1222 m |
| HDI | 871 m | 2093 m | 1222 m |
| HLLD | 871 m | 2093 m | 1222 m |
| HLLG | 871 m | 2093 m | 1222 m |
| HLLS | 871 m | 2093 m | 1222 m |
| HMIN | 871 m | 2077 m | 1206 m |
| HMNO | 871 m | 2077 m | 1206 m |
| HRM | 853 m | 2096 m | 1243 m |
| HTEM | 120 m | 2099 m | 1979 m |
| RWA | 852 m | 2099 m | 1247 m |
| RXOZ | 871 m | 2077 m | 1206 m |
Sonic (4 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DTCO | 859 m | 2089 m | 1229 m |
| DTSM | 859 m | 2086 m | 1226 m |
| PR | 852 m | 2099 m | 1247 m |
| VPVS | 852 m | 2099 m | 1247 m |
SP (1 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SP | 871 m | 2059 m | 1188 m |