Skip to content

Kingfisher 1

Bonaparte, Northern Territory

Kingfisher 1 is a petroleum well in the Bonaparte, Northern Territory, operated by Teikoku, drilled to a total depth of 3,257 m.

Request LAS Files & Well Summary

Well Information

Well Name
Kingfisher 1
Basin
Bonaparte
State
Northern Territory
Classification
FEST
Operator
Teikoku
Driller
Reading & Bates
Data Summary
Partial WDS Available

Drilling Data

Total Depth
3,257 m
Datum Elevation
29.6 m
Spud Date
20/05/1994
Completion Date
11/08/1994
Permit
NT EP 57

Location

Latitude
-14.7782
Longitude
129.1108

Available Log Data

3
Log Streams
38
Curves
475,395
Data Points
98,276
Metres

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 1082 m 3154 m 2072 m
CALS 336 m 3244 m 2907 m

Chromato (8 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 96 m 3257 m 3161 m
IBUT 96 m 3257 m 3161 m
METH 96 m 3257 m 3161 m
MTE2 1082 m 3159 m 2077 m
MTEM 1023 m 3261 m 2238 m
NBUT 96 m 3257 m 3161 m
PENT 96 m 3257 m 3161 m
PROP 96 m 3257 m 3161 m

Density (5 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 1084 m 3154 m 2069 m
LITH 1084 m 3154 m 2069 m
PEF 1084 m 3154 m 2069 m
RHGX 1084 m 3154 m 2069 m
RHOB 1084 m 3154 m 2069 m

GR (6 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CGR 1075 m 3147 m 2071 m
GR 34 m 3239 m 3205 m
POTA 1075 m 3147 m 2071 m
SGR 1075 m 3147 m 2071 m
THOR 1075 m 3147 m 2071 m
URAN 1075 m 3147 m 2071 m

Miscellaneous (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPT 96 m 3255 m 3158 m
DEPT 34 m 3261 m 3226 m
DEPT 96 m 3257 m 3161 m

Mudlog (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ROP 96 m 3255 m 3158 m
TGAS 96 m 3257 m 3161 m

Neutron (2 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NPHI 1084 m 3147 m 2062 m
TNPH 1084 m 3147 m 2062 m

Resistivity (5 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LLD 338 m 3254 m 2916 m
LLS 338 m 3254 m 2916 m
MRE2 1082 m 3159 m 2077 m
MRES 1023 m 3261 m 2238 m
MSFL 338 m 3244 m 2906 m

Sonic (4 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 1080 m 3249 m 2168 m
DTL 1080 m 3249 m 2168 m
DTLF 336 m 3251 m 2914 m
DTLN 336 m 3249 m 2912 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 338 m 3233 m 2895 m