Skip to content

Kuda Tasi 2

Bonaparte, Western Australia

Kuda Tasi 2 is a petroleum well in the Bonaparte, Western Australia, operated by Woodside, drilled to a total depth of 3,550 m.

Request LAS Files & Well Summary

Well Information

Well Name
Kuda Tasi 2
Basin
Bonaparte
State
Western Australia
Classification
FEFE
Operator
Woodside
Driller
Sedco
Data Summary
Partial WDS Available

Drilling Data

Total Depth
3,550 m
Datum Elevation
26.4 m
Spud Date
18/10/2003
Completion Date
19/11/2003
Permit
JDPA 03 01
Rig
Sedco 703

Location

Latitude
-10.5400
Longitude
126.1682

Available Log Data

5
Log Streams
67
Curves
608,514
Data Points
107,393
Metres

Other (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
VDEPT 454 m 3550 m 3096 m

Caliper (1 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
HCAL 2825 m 3509 m 684 m

Chromato (12 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CO2 2838 m 3550 m 712 m
ETHA 2838 m 3550 m 712 m
FLIN 454 m 3550 m 3096 m
IBUT 2838 m 3550 m 712 m
IPEN 2838 m 3550 m 712 m
MDOU 454 m 3550 m 3096 m
METH 2838 m 3550 m 712 m
MTIN 454 m 3550 m 3096 m
MTOU 454 m 3550 m 3096 m
NBUT 2838 m 3550 m 712 m
NPEN 2838 m 3550 m 712 m
PROP 2838 m 3550 m 712 m

Density (5 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
HDRA 2831 m 3508 m 677 m
HPRA 2831 m 3508 m 677 m
PEF8 2831 m 3508 m 677 m
PEFZ 2831 m 3508 m 677 m
RHOZ 2831 m 3508 m 677 m

GR (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR 1768 m 2890 m 1121 m
EHGR 1768 m 3540 m 1771 m
GR 400 m 2834 m 2433 m
HGR 1768 m 3499 m 1731 m

Miscellaneous (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITD 454 m 3550 m 3096 m
DEPT 400 m 2834 m 2434 m
DEPT 454 m 3550 m 3096 m
DEPT 2838 m 3550 m 712 m

Mudlog (16 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITT 454 m 3550 m 3096 m
DXC 454 m 3550 m 3096 m
LAG 454 m 3550 m 3096 m
MDIN 454 m 3550 m 3096 m
ROP 454 m 3550 m 3096 m
RPM 454 m 3550 m 3096 m
SPM 454 m 3550 m 3096 m
SPP 454 m 3550 m 3096 m
TBR 454 m 3550 m 3096 m
TDEP 539 m 1079 m 540 m
TDEP 1768 m 3540 m 1772 m
TGAS 454 m 3550 m 3096 m
TGAS 2838 m 3550 m 712 m
TORQA 454 m 3550 m 3096 m
TORQM 454 m 3550 m 3096 m
WOB 454 m 3550 m 3096 m

Neutron (4 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
HNPO 2495 m 3508 m 1013 m
HTNP 1768 m 3508 m 1740 m
NPHI 1768 m 3508 m 1740 m
TNPH 1768 m 3508 m 1740 m

Resistivity (15 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
DI_HRLT 2831 m 3508 m 677 m
HMIN 2831 m 3508 m 677 m
HMNO 2831 m 3508 m 677 m
HTEM 1768 m 3540 m 1771 m
RLA0 2831 m 3508 m 677 m
RLA1 2831 m 3508 m 677 m
RLA2 2831 m 3508 m 677 m
RLA3 2831 m 3508 m 677 m
RLA4 2831 m 3508 m 677 m
RLA5 2831 m 3508 m 677 m
RM_HRLT 2495 m 3509 m 1014 m
RT_HRLT 2831 m 3508 m 677 m
RXO_HRLT 2831 m 3508 m 677 m
RXO8 2831 m 3508 m 677 m
RXOZ 2831 m 3508 m 677 m

Sonic (4 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DTCO 1768 m 3519 m 1751 m
DTSM 2791 m 3519 m 728 m
PR 2791 m 3519 m 728 m
VPVS 2791 m 3519 m 728 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 2831 m 3530 m 699 m