Skip to content

Pyrenees 1

Carnarvon, Western Australia

Pyrenees 1 is a petroleum well in the Carnarvon, Western Australia, operated by BHP, drilled to a total depth of 1,500 m.

Request LAS Files & Well Summary

Well Information

Well Name
Pyrenees 1
Basin
Carnarvon
State
Western Australia
Classification
FEST
Operator
BHP
Driller
-
Data Summary
Partial WDS Available

Drilling Data

Total Depth
1,500 m
Datum Elevation
22.3 m
Spud Date
25/01/1994
Completion Date
04/02/1994
Permit
-
Rig
-

Location

Latitude
-21.5365
Longitude
114.1040

Available Log Data

2
Log Streams
45
Curves
229,642
Data Points
34,997
Metres

Borehole Geometry (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
AZIM 216 m 955 m 738 m
DEVI 216 m 955 m 738 m
TVD 946 m 1504 m 558 m

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 942 m 1490 m 547 m
CALS 621 m 1479 m 858 m

Chromato (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
MTEM 216 m 1497 m 1280 m
MTEM 942 m 1490 m 547 m

Density (4 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 946 m 1490 m 544 m
LITH 946 m 1490 m 544 m
PEF 946 m 1490 m 544 m
RHOB 946 m 1490 m 544 m

GR (7 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CGR 216 m 1484 m 1267 m
GR 875 m 1484 m 608 m
GRAM 952 m 1497 m 545 m
POTA 216 m 1484 m 1267 m
SGR 216 m 1484 m 1267 m
THOR 216 m 1484 m 1267 m
URAN 216 m 1484 m 1267 m

Miscellaneous (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 946 m 1504 m 558 m
DEPTH 216 m 1497 m 1280 m

Mudlog (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ROPS 958 m 1501 m 543 m
RPMS 958 m 1501 m 543 m
WBCS 958 m 1501 m 543 m

Neutron (2 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NPHI 946 m 1488 m 542 m
TNPH 946 m 1488 m 542 m

Resistivity (15 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LLD 621 m 1497 m 875 m
LLG 621 m 1497 m 875 m
LLS 621 m 1497 m 875 m
MRES 216 m 1497 m 1280 m
MRES 942 m 1490 m 547 m
MSFC 621 m 1479 m 858 m
MSFL 621 m 1479 m 858 m
PDEM 952 m 1498 m 546 m
RACM 952 m 1498 m 546 m
RADM 952 m 1498 m 546 m
RPCM 952 m 1498 m 546 m
RPDM 952 m 1498 m 546 m
SMIN 621 m 1479 m 858 m
SMNO 621 m 1479 m 858 m
TCDM 952 m 1501 m 549 m

Sonic (4 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 621 m 1493 m 871 m
DTL 621 m 1493 m 871 m
DTLF 621 m 1493 m 871 m
DTLN 621 m 1493 m 871 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 623 m 1472 m 849 m