Maple 2
Maple 2 is a petroleum well in the Browse, Northern Territory, operated by PTTEP, drilled to a total depth of 4,150 m.
Well Information
Drilling Data
- Total Depth
- 4,150 m
- Datum Elevation
- -129.5 m
- Spud Date
- 30/05/2012
- Completion Date
- 27/07/2012
- Permit
- AC RL 7
- Rig
- Ocean Patriot
Location
- Latitude
- -11.9895
- Longitude
- 124.5988
Available Log Data
Other (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| CRPM1 | 2574 m | 4149 m | 1574 m |
Caliper (1 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| DCAV | 3601 m | 4114 m | 512 m |
Chromato (8 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ETHA | 610 m | 4150 m | 3540 m |
| H2S | 610 m | 4150 m | 3540 m |
| IBUT | 610 m | 4150 m | 3540 m |
| IPEN | 610 m | 4150 m | 3540 m |
| METH | 610 m | 4150 m | 3540 m |
| NBUT | 610 m | 4150 m | 3540 m |
| NPEN | 610 m | 4150 m | 3540 m |
| PROP | 610 m | 4150 m | 3540 m |
Density (3 curves)
Bulk density measurements for porosity calculation and lithology identification.
| Curve | Start | End | Interval |
|---|---|---|---|
| DRHO | 3601 m | 4114 m | 512 m |
| PEF | 3601 m | 4114 m | 512 m |
| RHOB | 3601 m | 4114 m | 512 m |
GR (6 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ECGR_EDTC | 3407 m | 3995 m | 587 m |
| ECGR_EDTC | 2575 m | 3040 m | 464 m |
| GR | 155 m | 4138 m | 3983 m |
| GR_ARC | 2560 m | 4138 m | 1578 m |
| GR_EDTC | 3407 m | 3995 m | 587 m |
| GR_EDTC | 2575 m | 3040 m | 464 m |
Logging Parameters (5 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| CRPM | 167 m | 2578 m | 2411 m |
| CS | 2575 m | 3040 m | 464 m |
| CVEL | 3407 m | 3995 m | 587 m |
| TENS | 3407 m | 3995 m | 587 m |
| TENS | 2575 m | 3040 m | 464 m |
Miscellaneous (5 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPT | 155 m | 4149 m | 3994 m |
| DEPT | 610 m | 4150 m | 3540 m |
| DEPT | 2559 m | 4138 m | 1578 m |
| DEPT | 3407 m | 3995 m | 587 m |
| DEPT | 2575 m | 3040 m | 464 m |
Mudlog (5 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DHAP | 2564 m | 4139 m | 1575 m |
| DHAT | 2563 m | 4138 m | 1575 m |
| ECD | 2564 m | 4139 m | 1575 m |
| ROP5 | 168 m | 4149 m | 3981 m |
| TGAS | 610 m | 4150 m | 3540 m |
Neutron (1 curves)
Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.
| Curve | Start | End | Interval |
|---|---|---|---|
| TNPH | 3601 m | 4113 m | 511 m |
Resistivity (8 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| A40H | 2571 m | 4138 m | 1567 m |
| GTEM | 3407 m | 3995 m | 587 m |
| GTEM | 2575 m | 3040 m | 464 m |
| P16H | 2571 m | 4138 m | 1567 m |
| P22H | 2571 m | 4138 m | 1567 m |
| P28H | 2571 m | 4138 m | 1567 m |
| P34H | 2571 m | 4138 m | 1567 m |
| P40H | 2571 m | 4138 m | 1567 m |
Sonic (6 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| CHRA | 2563 m | 4120 m | 1557 m |
| DTCO | 2563 m | 4120 m | 1556 m |
| DTCO | 2563 m | 4120 m | 1556 m |
| DTSM | 2577 m | 4116 m | 1539 m |
| PR | 2577 m | 4116 m | 1539 m |
| VPVS | 2577 m | 4116 m | 1539 m |