Nancar 1
Nancar 1 is a petroleum well in the Browse, Northern Territory, operated by BHP, drilled to a total depth of 3,650 m.
Well Information
Drilling Data
- Total Depth
- 3,650 m
- Datum Elevation
- 22.0 m
- Spud Date
- 16/04/1989
- Completion Date
- 24/06/1989
- Permit
- NT AC/P4
- Rig
- Diamond M
Location
- Latitude
- -10.9891
- Longitude
- 125.7511
Comments
Sidetracked to Nancar 1 ST1
Available Log Data
Accelerometer (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| AZ | 2028 m | 3355 m | 1326 m |
Borehole Geometry (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| AZIM | 3111 m | 3355 m | 243 m |
Caliper (4 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALI | 2013 m | 3645 m | 1632 m |
| CALI | 2013 m | 3645 m | 1632 m |
| CALS | 2992 m | 3645 m | 652 m |
| CALS | 705 m | 3645 m | 2939 m |
CaliperCalcite (2 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALC | 714 m | 3106 m | 2392 m |
| CALC | 3111 m | 3647 m | 536 m |
Chromato (11 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ETHA | 2716 m | 3404 m | 687 m |
| ETHA | 3243 m | 3558 m | 315 m |
| IBUT | 3327 m | 3334 m | 6 m |
| IBUT | 3193 m | 3349 m | 155 m |
| METH | 2321 m | 3432 m | 1111 m |
| METH | 3243 m | 3594 m | 351 m |
| MTEM | 2013 m | 3646 m | 1633 m |
| MTEM | 250 m | 3646 m | 3396 m |
| NBUT | 3243 m | 3334 m | 91 m |
| PROP | 2725 m | 3370 m | 644 m |
| PROP | 3243 m | 3552 m | 309 m |
Density (6 curves)
Bulk density measurements for porosity calculation and lithology identification.
| Curve | Start | End | Interval |
|---|---|---|---|
| DRHO | 2013 m | 3646 m | 1633 m |
| DRHO | 2013 m | 3646 m | 1633 m |
| PEF | 2013 m | 3646 m | 1633 m |
| PEF | 2026 m | 3646 m | 1619 m |
| RHOB | 2013 m | 3646 m | 1633 m |
| RHOB | 2013 m | 3646 m | 1633 m |
GR (14 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| CGR | 2020 m | 3636 m | 1615 m |
| CGR | 250 m | 3635 m | 3385 m |
| GR | 2992 m | 3628 m | 635 m |
| GR | 1973 m | 3628 m | 1654 m |
| GRD | 3101 m | 3359 m | 258 m |
| GRD | 2023 m | 3359 m | 1335 m |
| POTA | 2020 m | 3636 m | 1615 m |
| POTA | 2020 m | 3635 m | 1615 m |
| SGR | 2020 m | 3636 m | 1615 m |
| SGR | 250 m | 3635 m | 3385 m |
| THOR | 2020 m | 3636 m | 1615 m |
| THOR | 2020 m | 3635 m | 1615 m |
| URAN | 2020 m | 3636 m | 1615 m |
| URAN | 2020 m | 3635 m | 1615 m |
Miscellaneous (8 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPT | 2013 m | 3646 m | 1633 m |
| DEPT | 250 m | 3646 m | 3396 m |
| DEPT | 254 m | 3433 m | 3179 m |
| DEPT | 3109 m | 3649 m | 539 m |
| DEPT | 3101 m | 3370 m | 268 m |
| DEPT | 2022 m | 3370 m | 1347 m |
| INC | 3111 m | 3355 m | 243 m |
| INC | 2028 m | 3355 m | 1326 m |
Mudlog (11 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DOLO | 714 m | 3396 m | 2681 m |
| ROP | 254 m | 3433 m | 3179 m |
| ROP | 3109 m | 3649 m | 539 m |
| ROP | 3114 m | 3370 m | 256 m |
| ROP | 2022 m | 3370 m | 1347 m |
| RPM | 3114 m | 3370 m | 256 m |
| RPM | 2022 m | 3370 m | 1347 m |
| TGAS | 2321 m | 3432 m | 1111 m |
| TGAS | 3243 m | 3601 m | 358 m |
| WOB | 3114 m | 3370 m | 256 m |
| WOB | 2022 m | 3370 m | 1347 m |
Neutron (4 curves)
Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.
| Curve | Start | End | Interval |
|---|---|---|---|
| NPHI | 2013 m | 3646 m | 1633 m |
| NPHI | 2013 m | 3646 m | 1633 m |
| TNPH | 2013 m | 3646 m | 1633 m |
| TNPH | 2013 m | 3646 m | 1633 m |
Resistivity (16 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| LLD | 2992 m | 3646 m | 654 m |
| LLD | 708 m | 3646 m | 2938 m |
| LLG | 2992 m | 3646 m | 654 m |
| LLG | 708 m | 3646 m | 2938 m |
| LLS | 2992 m | 3646 m | 654 m |
| LLS | 708 m | 3646 m | 2938 m |
| MRES | 2013 m | 3646 m | 1633 m |
| MRES | 250 m | 3646 m | 3396 m |
| MSFC | 2992 m | 3642 m | 649 m |
| MSFC | 708 m | 3642 m | 2933 m |
| MSFL | 2992 m | 3642 m | 649 m |
| MSFL | 708 m | 3642 m | 2933 m |
| SNC | 3101 m | 3360 m | 258 m |
| SNC | 2023 m | 3360 m | 1336 m |
| TEMP | 3114 m | 3370 m | 255 m |
| TEMP | 2028 m | 3370 m | 1342 m |
Sonic (4 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DT | 2992 m | 3633 m | 640 m |
| DT | 704 m | 3633 m | 2928 m |
| DTL | 2992 m | 3633 m | 640 m |
| DTL | 704 m | 3633 m | 2928 m |
SP (2 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SP | 2992 m | 3633 m | 640 m |
| SP | 708 m | 3633 m | 2924 m |