Skip to content

Pascal 1

Browse, Northern Territory

Pascal 1 is a petroleum well in the Browse, Northern Territory, operated by BHP, drilled to a total depth of 2,850 m.

Request LAS Files & Well Summary

Well Information

Well Name
Pascal 1
Basin
Browse
State
Northern Territory
Classification
FEST
Operator
BHP
Driller
Sedco
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,850 m
Datum Elevation
26.0 m
Spud Date
27/02/1990
Completion Date
27/03/1990
Permit
NT AC/P 2
Rig
Sedco 708

Location

Latitude
-12.2126
Longitude
124.2213

Available Log Data

2
Log Streams
33
Curves
330,802
Data Points
50,414
Metres

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 2372 m 2843 m 470 m
CALS 426 m 2843 m 2417 m

CaliperCalcite (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CALC 464 m 2849 m 2384 m

Chromato (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 2517 m 2795 m 277 m
METH 2265 m 2849 m 583 m
MTE2 2372 m 2843 m 470 m
MTEM 94 m 2843 m 2748 m
PROP 2517 m 2776 m 258 m

Density (3 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 2372 m 2843 m 470 m
PEF 2372 m 2843 m 470 m
RHOB 2372 m 2843 m 470 m

GR (6 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CGR 2372 m 2844 m 472 m
GR 94 m 2834 m 2739 m
POTA 2372 m 2844 m 472 m
SGR 2372 m 2844 m 472 m
THOR 2372 m 2844 m 472 m
URAN 2372 m 2844 m 472 m

Miscellaneous (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPT 94 m 2844 m 2750 m
DEPT 175 m 2849 m 2674 m

Mudlog (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DOLO 465 m 2849 m 2384 m
ROP 175 m 2849 m 2674 m
TGAS 2265 m 2849 m 583 m
WOB 178 m 2849 m 2671 m

Neutron (1 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NPHI 2372 m 2843 m 470 m

Resistivity (6 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LLD 430 m 2843 m 2412 m
LLG 430 m 2843 m 2412 m
LLS 430 m 2843 m 2412 m
MRE2 2372 m 2843 m 470 m
MRES 94 m 2843 m 2748 m
MSFL 430 m 2840 m 2409 m

Sonic (2 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 426 m 2834 m 2407 m
DTL 426 m 2834 m 2407 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 430 m 2825 m 2394 m