Skip to content

Pituri 1

Browse, Northern Territory

Pituri 1 is a petroleum well in the Browse, Northern Territory, operated by BHP, drilled to a total depth of 2,124 m.

Request LAS Files & Well Summary

Well Information

Well Name
Pituri 1
Basin
Browse
State
Northern Territory
Classification
FEST
Operator
BHP
Driller
Sedco-Forex
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,124 m
Datum Elevation
26.5 m
Spud Date
20/04/1994
Completion Date
05/05/1994
Permit
NT AC/P 2
Rig
Rig 708

Location

Latitude
-12.3435
Longitude
124.3006

Available Log Data

3
Log Streams
43
Curves
310,666
Data Points
47,348
Metres

Borehole Geometry (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEVI 920 m 1089 m 169 m
HAZI 920 m 2118 m 1198 m

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 922 m 2118 m 1196 m
CALS 922 m 2116 m 1194 m

CaliperCalcite (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CALC 941 m 2125 m 1183 m

Chromato (7 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 1692 m 2019 m 327 m
IBUT 1708 m 2103 m 394 m
METH 1689 m 2089 m 399 m
MTE2 920 m 2118 m 1198 m
MTEM 911 m 2120 m 1209 m
NBUT 1707 m 1741 m 33 m
PROP 1692 m 1736 m 44 m

Density (4 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 924 m 2118 m 1194 m
LITH 924 m 2118 m 1194 m
PEF 924 m 2118 m 1194 m
RHOB 924 m 2118 m 1194 m

GR (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 911 m 2103 m 1191 m
GR1 919 m 2109 m 1189 m
SGRC 871 m 2118 m 1247 m

Miscellaneous (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPT 115 m 2125 m 2010 m
DEPT 870 m 2121 m 1250 m
DEPT 911 m 2120 m 1209 m

Mudlog (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DOLO 942 m 2125 m 1183 m
ROP 115 m 2123 m 2007 m
TGAS 1664 m 2104 m 439 m
WOB 118 m 2124 m 2006 m

Neutron (2 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NPHI 922 m 2118 m 1196 m
TNPH 924 m 2118 m 1193 m

Resistivity (10 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LLD 924 m 2120 m 1196 m
LLG 924 m 2120 m 1196 m
LLS 924 m 2120 m 1196 m
MRE2 920 m 2118 m 1198 m
MRES 911 m 2120 m 1209 m
MSFC 924 m 2116 m 1191 m
MSFL 924 m 2116 m 1191 m
SEWP 923 m 2121 m 1197 m
SMIN 924 m 2116 m 1191 m
SMNO 924 m 2116 m 1191 m

Sonic (4 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 922 m 2112 m 1190 m
DTL 922 m 2112 m 1190 m
DTLF 922 m 2112 m 1190 m
DTLN 922 m 2112 m 1190 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 924 m 2095 m 1170 m