Skip to content

Skua 9

Browse, Northern Territory

Skua 9 is a petroleum well in the Browse, Northern Territory, operated by BHP, drilled to a total depth of 2,550 m.

Request LAS Files & Well Summary

Well Information

Well Name
Skua 9
Basin
Browse
State
Northern Territory
Classification
FDSC
Operator
BHP
Driller
Sedco
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,550 m
Datum Elevation
26.5 m
Spud Date
23/05/1991
Completion Date
02/07/1991
Permit
NT AC/L 4
Rig
Forex 708

Location

Latitude
-12.4980
Longitude
124.4200

Comments

Includes Skua 9 top hole data Sidetracked to Skua 9 ST1

Available Log Data

6
Log Streams
94
Curves
790,551
Data Points
120,485
Metres

Caliper (4 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 1510 m 1929 m 419 m
CALI 1510 m 2547 m 1037 m
CALS 368 m 1941 m 1572 m
CALS 368 m 2537 m 2168 m

CaliperCalcite (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CALC 2140 m 2377 m 236 m
CALC 395 m 2529 m 2133 m

Chromato (12 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 2313 m 2377 m 64 m
ETHA 1529 m 2532 m 1002 m
IBUT 2320 m 2361 m 41 m
IBUT 1713 m 2520 m 806 m
METH 2143 m 2545 m 402 m
METH 1528 m 2533 m 1004 m
MTEM 105 m 1944 m 1838 m
MTEM 106 m 2541 m 2435 m
NBUT 2320 m 2361 m 40 m
NBUT 1713 m 2525 m 812 m
PROP 2314 m 2370 m 56 m
PROP 1530 m 2528 m 998 m

Density (6 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 1512 m 1929 m 416 m
DRHO 1512 m 2547 m 1034 m
PEF 1512 m 1929 m 416 m
PEF 1512 m 2547 m 1034 m
RHOB 1512 m 1929 m 416 m
RHOB 1512 m 2547 m 1034 m

GR (14 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CGR 1500 m 2541 m 1041 m
CGR 1500 m 1917 m 416 m
GR 105 m 1522 m 1416 m
GR 106 m 2526 m 2420 m
GRD 2066 m 2541 m 475 m
GRD 1518 m 2524 m 1005 m
POTA 1500 m 2541 m 1041 m
POTA 1500 m 1917 m 416 m
SGR 1500 m 2541 m 1041 m
SGR 1500 m 1917 m 416 m
THOR 1500 m 2541 m 1041 m
THOR 1500 m 1917 m 416 m
URAN 1500 m 2541 m 1041 m
URAN 1500 m 1917 m 416 m

Miscellaneous (6 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPT 2066 m 2544 m 478 m
DEPT 2070 m 2549 m 479 m
DEPT 105 m 1944 m 1838 m
DEPT 1518 m 2525 m 1006 m
DEPT 109 m 2534 m 2424 m
DEPT 106 m 2549 m 2443 m

Mudlog (7 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DOLO 660 m 842 m 182 m
ROP 2070 m 2546 m 476 m
ROP 109 m 2534 m 2424 m
TGAS 2143 m 2545 m 402 m
TGAS 1528 m 2533 m 1004 m
WOB 2070 m 2546 m 475 m
WOB 111 m 2534 m 2422 m

Neutron (4 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NPHI 1512 m 1923 m 410 m
NPHI 1512 m 2549 m 1036 m
TNPH 1512 m 1923 m 410 m
TNPH 1512 m 2549 m 1036 m

Resistivity (13 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LLD 371 m 1944 m 1573 m
LLD 371 m 2541 m 2169 m
LLG 1512 m 2541 m 1028 m
LLG 1512 m 1944 m 432 m
LLS 371 m 1944 m 1573 m
LLS 371 m 2541 m 2169 m
MRES 105 m 1944 m 1838 m
MRES 106 m 2541 m 2435 m
MSFL 371 m 1941 m 1569 m
MSFL 106 m 2537 m 2431 m
SN 2106 m 2541 m 434 m
SNC 2106 m 2541 m 435 m
SNC 1519 m 2525 m 1005 m

Sonic (24 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 368 m 1932 m 1563 m
DT 368 m 2531 m 2162 m
DTL 368 m 1932 m 1563 m
DTL 368 m 2531 m 2162 m
DTLF 368 m 1932 m 1563 m
DTLF 368 m 2531 m 2162 m
DTLN 368 m 1932 m 1563 m
DTLN 368 m 2531 m 2162 m
LTT1 368 m 1932 m 1563 m
LTT1 368 m 2531 m 2162 m
LTT2 368 m 1932 m 1563 m
LTT2 368 m 2531 m 2162 m
LTT3 368 m 1932 m 1563 m
LTT3 368 m 2531 m 2162 m
LTT4 368 m 1932 m 1563 m
LTT4 368 m 2531 m 2162 m
TT1 368 m 1932 m 1563 m
TT1 368 m 2531 m 2162 m
TT2 368 m 1932 m 1563 m
TT2 368 m 2531 m 2162 m
TT3 368 m 1932 m 1563 m
TT3 368 m 2531 m 2162 m
TT4 368 m 1932 m 1563 m
TT4 368 m 2531 m 2162 m

SP (2 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 371 m 1911 m 1539 m
SP 372 m 2515 m 2143 m