Skip to content

Bayu-Undan D13

Bonaparte, Northern Territory

Bayu-Undan D13 is a petroleum well in the Bonaparte, Northern Territory, operated by ConocoPhillips, drilled to a total depth of 2,533 m.

Request LAS Files & Well Summary

Well Information

Well Name
Bayu-Undan D13
Basin
Bonaparte
State
Northern Territory
Classification
FDPD
Operator
ConocoPhillips
Driller
Ensco
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,533 m
Datum Elevation
58.0 m
Spud Date
18/09/2003
Completion Date
10/10/2004
Permit
JPDA 03-12 & 03-13
Rig
104

Location

Latitude
-11.0699
Longitude
126.6125

Available Log Data

3
Log Streams
39
Curves
301,583
Data Points
69,333
Metres

Borehole Geometry (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
TVD 840 m 2533 m 1692 m
TVD 141 m 2533 m 2391 m

Chromato (11 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 840 m 1700 m 860 m
FLIN 141 m 2533 m 2391 m
FLOU 141 m 2533 m 2391 m
IBUT 840 m 1700 m 860 m
IPEN 840 m 1700 m 860 m
MDOU 174 m 2533 m 2358 m
METH 840 m 1700 m 860 m
NBUT 840 m 1700 m 860 m
NPEN 840 m 1700 m 860 m
PENT 840 m 1700 m 860 m
PROP 840 m 1700 m 860 m

DDS (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
SAAX 830 m 2532 m 1702 m
SAAY 830 m 2532 m 1702 m
SAAZ 830 m 2464 m 1633 m

Density (3 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
SPAX 830 m 2532 m 1702 m
SPAY 830 m 2532 m 1702 m
SPAZ 830 m 2532 m 1702 m

GR (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
SGRA 820 m 2523 m 1703 m
SGRB 820 m 2523 m 1703 m
SGRC 820 m 2523 m 1703 m

Miscellaneous (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITD 141 m 2533 m 2391 m
DEPT 840 m 1700 m 860 m
DEPT 820 m 2533 m 1712 m
DEPT 141 m 2533 m 2392 m

Mudlog (13 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITT 141 m 2533 m 2391 m
HKLD 141 m 2533 m 2391 m
MDIN 141 m 2533 m 2391 m
ROP 141 m 2533 m 2391 m
RPMB 141 m 2533 m 2391 m
RPMM 141 m 2285 m 2143 m
RPMS 141 m 2533 m 2391 m
SPP 141 m 2533 m 2391 m
SROP 830 m 2532 m 1702 m
TGAS 846 m 1700 m 853 m
TORQ 141 m 2533 m 2391 m
TREV 141 m 2533 m 2391 m
WOB 141 m 2533 m 2391 m