Skip to content

Brocket 1

Carnarvon, Western Australia

Brocket 1 is a petroleum well in the Carnarvon, Western Australia, operated by Apache, drilled to a total depth of 1,944 m.

Request LAS Files & Well Summary

Well Information

Well Name
Brocket 1
Basin
Carnarvon
State
Western Australia
Classification
FEST
Operator
Apache
Driller
Ensco
Data Summary
Partial WDS Available

Drilling Data

Total Depth
1,944 m
Datum Elevation
35.4 m
Spud Date
10/02/2007
Completion Date
17/02/2007
Permit
WA 209 P
Rig
Ensco 106

Location

Latitude
-20.2836
Longitude
116.0810

Available Log Data

5
Log Streams
63
Curves
425,791
Data Points
81,974
Metres

Other (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CHRS 1247 m 1381 m 134 m
CHTS 1250 m 1463 m 212 m

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
DCHO 819 m 1931 m 1112 m
DCVE 819 m 1931 m 1112 m

Chromato (10 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 827 m 1944 m 1117 m
IBUT 827 m 1944 m 1117 m
IPEN 827 m 1944 m 1117 m
MDOU 87 m 1944 m 1857 m
METH 827 m 1944 m 1117 m
MTIN 87 m 1944 m 1857 m
MTOU 87 m 1944 m 1857 m
NBUT 827 m 1944 m 1117 m
NPEN 827 m 1944 m 1117 m
PROP 827 m 1944 m 1117 m

Density (3 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHB 819 m 1931 m 1112 m
PEB 819 m 1931 m 1112 m
ROBB 819 m 1931 m 1112 m

GR (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 1220 m 1602 m 381 m
GR_ARC 86 m 812 m 725 m
GRMA 819 m 1932 m 1113 m

Miscellaneous (7 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITD 87 m 1944 m 1857 m
DEPTH 86 m 1943 m 1857 m
DEPTH 827 m 1944 m 1117 m
DEPTH 87 m 1944 m 1857 m
DEPTH 1220 m 1602 m 382 m
DEPTH 825 m 1916 m 1091 m
MFIN 87 m 1944 m 1857 m

Mudlog (20 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
APRS_ARC 86 m 813 m 726 m
ATMP 86 m 813 m 726 m
BITH 87 m 1944 m 1857 m
DHAP 819 m 1933 m 1113 m
DHAT 819 m 1933 m 1113 m
ECD 819 m 1933 m 1113 m
ECD_ARC 104 m 813 m 708 m
MDIN 87 m 1944 m 1857 m
PITV 87 m 1944 m 1857 m
ROP 87 m 1944 m 1857 m
ROP5_RM 91 m 1943 m 1851 m
ROTT 87 m 1944 m 1857 m
RPMB 87 m 1944 m 1857 m
RPMM 87 m 1944 m 1857 m
RPMS 87 m 1944 m 1857 m
SPP 87 m 1944 m 1857 m
TGAS 827 m 1944 m 1117 m
TORQ 87 m 1944 m 1857 m
TREV 87 m 1944 m 1857 m
WOB 87 m 1944 m 1857 m

Neutron (1 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
TNPH 819 m 1929 m 1109 m

Resistivity (6 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
P16H 86 m 1930 m 1844 m
P22H 86 m 1930 m 1844 m
P28H 86 m 1930 m 1844 m
P34H 86 m 1930 m 1844 m
P40H 86 m 1930 m 1844 m
TAB 86 m 1930 m 1844 m

Sonic (9 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
CHRA 820 m 1913 m 1093 m
CHRP 834 m 1913 m 1079 m
CHTA 820 m 1913 m 1093 m
CHTP 837 m 1916 m 1078 m
DTBC 820 m 1913 m 1093 m
DTCO 834 m 1916 m 1082 m
DTSM 1249 m 1578 m 329 m
PR 1249 m 1578 m 329 m
VPVS 1249 m 1578 m 329 m