Skip to content

Cyrano 1

Carnarvon, Western Australia

Cyrano 1 is a petroleum well in the Carnarvon, Western Australia, operated by Tap, drilled to a total depth of 769 m.

Request LAS Files & Well Summary

Well Information

Well Name
Cyrano 1
Basin
Carnarvon
State
Western Australia
Classification
FEST
Operator
Tap
Driller
Ensco
Data Summary
Partial WDS Available

Drilling Data

Total Depth
769 m
Datum Elevation
-
Spud Date
20/03/2003
Completion Date
25/03/2003
Permit
EP 364
Rig
Ensco-53

Location

Latitude
-21.3595
Longitude
115.2860

Available Log Data

5
Log Streams
55
Curves
202,160
Data Points
29,349
Metres

Borehole Geometry (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GDEV 24 m 733 m 708 m

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
HCAL 350 m 737 m 387 m
HDAR 348 m 737 m 389 m

Chromato (8 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 353 m 769 m 416 m
IPEN 353 m 769 m 416 m
MDOU 50 m 769 m 719 m
METH 353 m 769 m 416 m
MWIN 50 m 769 m 719 m
NBUT 353 m 769 m 416 m
NPEN 353 m 769 m 416 m
PROP 353 m 769 m 416 m

Density (4 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
HDRA 351 m 737 m 386 m
HPRA 351 m 737 m 386 m
PEFZ 351 m 737 m 386 m
RHOZ 351 m 737 m 386 m

GR (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR 24 m 732 m 708 m
EHGR 24 m 732 m 708 m
GR 24 m 732 m 708 m
GR 350 m 732 m 382 m

Logging Parameters (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
TENS 24 m 761 m 737 m
TENS 350 m 751 m 401 m

Miscellaneous (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITD 50 m 769 m 719 m
DEPTH 350 m 751 m 401 m
DEPTH 353 m 769 m 416 m
DEPTH 50 m 769 m 719 m
MFIN 50 m 769 m 719 m

Mudlog (13 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITT 50 m 769 m 719 m
DXC 50 m 454 m 404 m
ECD 50 m 769 m 719 m
PITV 50 m 769 m 719 m
PPRS 50 m 769 m 719 m
ROP 50 m 769 m 719 m
RPMS 50 m 769 m 719 m
TBR 50 m 769 m 719 m
TDEP 24 m 761 m 737 m
TDEP 24 m 761 m 736 m
TGAS 353 m 769 m 416 m
TQAV 50 m 769 m 719 m
WOB 50 m 769 m 719 m

Neutron (2 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NPHI 24 m 737 m 713 m
TNPH 24 m 737 m 713 m

Resistivity (9 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
HART 351 m 754 m 403 m
HDI 351 m 754 m 403 m
HLLD 351 m 754 m 403 m
HLLG 351 m 754 m 403 m
HLLS 351 m 754 m 403 m
HMIN 351 m 737 m 386 m
HMNO 351 m 737 m 386 m
HRM 351 m 754 m 403 m
RXOZ 351 m 737 m 386 m

Sonic (4 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DTCO 350 m 751 m 401 m
DTSM 350 m 751 m 401 m
PR 350 m 751 m 401 m
VPVS 350 m 751 m 401 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 351 m 724 m 373 m