Skip to content

Cyrano 2

Carnarvon, Western Australia

Cyrano 2 is a petroleum well in the Carnarvon, Western Australia, operated by Tap, drilled to a total depth of 1,737 m.

Request LAS Files & Well Summary

Well Information

Well Name
Cyrano 2
Basin
Carnarvon
State
Western Australia
Classification
FEST
Operator
Tap
Driller
Ensco
Data Summary
Partial WDS Available

Drilling Data

Total Depth
1,737 m
Datum Elevation
33.3 m
Spud Date
06/12/2004
Completion Date
14/12/2004
Permit
EP 364
Rig
Ensco 56

Location

Latitude
-21.3645
Longitude
115.2790

Comments

includes mudlog

Available Log Data

4
Log Streams
101
Curves
618,926
Data Points
80,579
Metres

Caliper (4 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CAL 632 m 748 m 115 m
CAL 616 m 1738 m 1122 m
CALX 616 m 1711 m 1095 m
CALY 616 m 1738 m 1122 m

Chromato (8 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 356 m 1737 m 1380 m
IBUT 356 m 1737 m 1380 m
MDOU 136 m 1737 m 1601 m
METH 356 m 1737 m 1380 m
MTIN 49 m 1737 m 1687 m
MTOU 136 m 1737 m 1601 m
NBUT 356 m 1737 m 1380 m
PROP 356 m 1737 m 1380 m

CMR (37 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
MBVI 639 m 747 m 107 m
MBVIA2 639 m 747 m 107 m
MBVIA3 639 m 747 m 107 m
MBVIA4 639 m 747 m 107 m
MBVIA5 639 m 747 m 107 m
MBVIB 639 m 747 m 107 m
MBVIB2 639 m 747 m 107 m
MBVIB3 639 m 747 m 107 m
MBVM 639 m 747 m 107 m
MBVMA2 639 m 747 m 107 m
MBVMA3 639 m 747 m 107 m
MBVMA4 639 m 747 m 107 m
MBVMA5 639 m 747 m 107 m
MBVMB 639 m 747 m 107 m
MBVMB2 639 m 747 m 107 m
MBVMB3 639 m 747 m 107 m
MBVMC 639 m 747 m 107 m
MCBW 639 m 744 m 104 m
MPHSA2 639 m 744 m 104 m
MPHSA3 639 m 744 m 104 m
MPHSA4 639 m 744 m 104 m
MPHSA5 639 m 744 m 104 m
MPRM 639 m 747 m 107 m
MPRMA2 639 m 747 m 107 m
MPRMA3 639 m 747 m 107 m
MPRMA4 639 m 747 m 107 m
MPRMA5 639 m 747 m 107 m
SBVM 639 m 747 m 107 m
SBVMA2 639 m 747 m 107 m
SBVMA3 639 m 747 m 107 m
SBVMA4 639 m 747 m 107 m
SBVMA5 639 m 747 m 107 m
SPRM 639 m 747 m 107 m
SPRMA2 639 m 747 m 107 m
SPRMA3 639 m 747 m 107 m
SPRMA4 639 m 747 m 107 m
SPRMA5 639 m 747 m 107 m

Density (4 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
PEF 619 m 1713 m 1094 m
ZCOR 619 m 1711 m 1092 m
ZDEN 619 m 1712 m 1093 m
ZDNC 619 m 1711 m 1092 m

GR (9 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 625 m 739 m 114 m
GR 19 m 1704 m 1684 m
GRSL 585 m 1701 m 1115 m
K 585 m 1700 m 1114 m
KAPI 585 m 1700 m 1114 m
THAPI 585 m 1700 m 1114 m
THOR 585 m 1700 m 1114 m
UAPI 585 m 1700 m 1114 m
URAN 585 m 1700 m 1114 m

Logging Parameters (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
TEN 613 m 1739 m 1126 m

Miscellaneous (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 49 m 1737 m 1687 m
MFIN 49 m 1737 m 1687 m
MFOU 49 m 1737 m 1687 m
MPHS 639 m 744 m 104 m

Mudlog (14 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
HKLD 49 m 1737 m 1687 m
MDIN 49 m 1737 m 1687 m
ROP 49 m 1737 m 1687 m
RPMM 49 m 1572 m 1522 m
RPMS 49 m 1737 m 1687 m
RPMT 49 m 1737 m 1687 m
SPP 49 m 1737 m 1687 m
TDEP 593 m 1740 m 1146 m
TDEP 621 m 748 m 127 m
TDEP 15 m 1740 m 1724 m
TGAS 136 m 1737 m 1601 m
TORQ 49 m 1737 m 1687 m
TTEN 613 m 1739 m 1126 m
WOB 49 m 1737 m 1687 m

Neutron (2 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
CNC 612 m 1703 m 1090 m
CNCF 612 m 1703 m 1090 m

Resistivity (8 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
BHT 631 m 746 m 115 m
RD 619 m 1729 m 1110 m
RMLL 619 m 1738 m 1119 m
RS 619 m 1729 m 1110 m
WRM 621 m 735 m 114 m
WRM 15 m 1697 m 1681 m
WTBH 621 m 735 m 114 m
WTBH 15 m 1697 m 1681 m

Sonic (8 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT24.I 601 m 1714 m 1113 m
DT24S 598 m 1714 m 1116 m
DTC.I 602 m 1716 m 1114 m
DTS.I 613 m 1716 m 1102 m
DTST.I 602 m 1716 m 1114 m
DTXX.I 599 m 1712 m 1112 m
POIR.IX 602 m 1712 m 1110 m
VPVS.IX 593 m 1740 m 1146 m

SP (2 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SPSB 567 m 1693 m 1126 m
SPSBDH 622 m 1690 m 1068 m