Skip to content

Pluto 4

Carnarvon, Western Australia

Pluto 4 is a petroleum well in the Carnarvon, Western Australia, operated by Woodside, drilled to a total depth of 3,642 m.

Request LAS Files & Well Summary

Well Information

Well Name
Pluto 4
Basin
Carnarvon
State
Western Australia
Classification
FEFA
Operator
Woodside
Driller
Atwood
Data Summary
Partial WDS Available

Drilling Data

Total Depth
3,642 m
Datum Elevation
22.4 m
Spud Date
29/04/2006
Completion Date
31/05/2006
Permit
WA 350 P
Rig
Eagle

Location

Latitude
-19.8421
Longitude
115.1650

Available Log Data

8
Log Streams
135
Curves
1,560,225
Data Points
201,067
Metres

Other (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
TTM1[0] 2119 m 3636 m 1516 m
TTM2[0] 2119 m 3636 m 1516 m
TTM3[0] 2119 m 3636 m 1516 m

Borehole Geometry (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEVI 2119 m 3636 m 1516 m
HAZI 2119 m 3636 m 1516 m
ICV 2119 m 3636 m 1516 m
IHV 2119 m 3636 m 1516 m
P1AZ 2119 m 3636 m 1516 m

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
HCAL 2120 m 3622 m 1502 m
HDAR 2120 m 3622 m 1502 m

Chromato (12 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 2100 m 3642 m 1542 m
ETHA 2119 m 3622 m 1502 m
IBUT 2100 m 3642 m 1542 m
IPEN 2100 m 3642 m 1542 m
MDOU 993 m 3642 m 2649 m
METH 2100 m 3642 m 1542 m
METH 2119 m 3622 m 1502 m
MTIN 993 m 3642 m 2649 m
MTOU 993 m 3642 m 2649 m
NBUT 2100 m 3642 m 1542 m
NPEN 2100 m 3642 m 1542 m
PROP 2100 m 3642 m 1542 m

CMR (27 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BFV 2938 m 3636 m 698 m
CBF1 2938 m 3636 m 698 m
CBF2 2938 m 3636 m 698 m
CBF3 2938 m 3636 m 698 m
CBF4 2938 m 3636 m 698 m
CBF5 2938 m 3636 m 698 m
CBF6 2938 m 3636 m 698 m
CBF7 2938 m 3636 m 698 m
CBP1 2938 m 3636 m 698 m
CBP2 2938 m 3636 m 698 m
CBP3 2938 m 3636 m 698 m
CBP4 2938 m 3636 m 698 m
CBP5 2938 m 3636 m 698 m
CBP6 2938 m 3636 m 698 m
CBP7 2938 m 3636 m 698 m
CBP8 2938 m 3636 m 698 m
CFF1 2938 m 3636 m 698 m
CFF2 2938 m 3636 m 698 m
CFF3 2938 m 3636 m 698 m
CFF4 2938 m 3636 m 698 m
CFF5 2938 m 3636 m 698 m
CFF6 2938 m 3636 m 698 m
CFF7 2938 m 3636 m 698 m
CMFF 2938 m 3636 m 698 m
KSDR 2938 m 3636 m 698 m
KTIM 2938 m 3636 m 698 m
TCMR 2938 m 3636 m 698 m

Density (6 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
HDRA 2125 m 3623 m 1498 m
HPRA 2125 m 3623 m 1498 m
PEF8 2125 m 3623 m 1498 m
PEFZ 2125 m 3623 m 1498 m
RHO8 2125 m 3623 m 1498 m
RHOZ 2125 m 3623 m 1498 m

GR (12 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR 2076 m 3611 m 1535 m
EHGR 2076 m 3626 m 1550 m
GR 2076 m 3611 m 1535 m
HCGR 2120 m 3615 m 1495 m
HFK 2120 m 3615 m 1495 m
HGR 2076 m 3626 m 1550 m
HSGR 2120 m 3615 m 1495 m
HTHO 2120 m 3615 m 1495 m
HURA 2120 m 3615 m 1495 m
SGRA 2126 m 3637 m 1510 m
SGRB 2126 m 3637 m 1510 m
SGRC 2126 m 3637 m 1511 m

Logging Parameters (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CDF 2119 m 3636 m 1516 m
CS 2119 m 3636 m 1516 m
TENS 2119 m 3636 m 1516 m
TENS 2076 m 3637 m 1561 m

Miscellaneous (8 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITD 993 m 3642 m 2649 m
BS 2119 m 3636 m 1516 m
DEPTH 2100 m 3642 m 1542 m
DEPTH 2124 m 3642 m 1518 m
DEPTH 2119 m 3636 m 1516 m
DEPTH 2077 m 3638 m 1561 m
DEPTH 993 m 3642 m 2649 m
MFIN 993 m 3642 m 2649 m

Mudlog (17 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITT 993 m 3642 m 2649 m
DXC 993 m 3642 m 2649 m
MDEPT 2100 m 3642 m 1542 m
MDEPT 993 m 3642 m 2649 m
MDIN 993 m 3642 m 2649 m
ROP 993 m 3642 m 2649 m
ROTT 993 m 3642 m 2649 m
RPM 993 m 3642 m 2649 m
SPP 993 m 3642 m 2649 m
SROP 2126 m 3640 m 1514 m
TDEP 2938 m 3636 m 698 m
TDEP 2076 m 3638 m 1561 m
TDEP 2076 m 3638 m 1561 m
TGAS 2100 m 3642 m 1542 m
TORQ 993 m 3642 m 2649 m
TREV 993 m 3642 m 2649 m
WOB 993 m 3642 m 2649 m

Neutron (4 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
HNPO 2076 m 3621 m 1545 m
HTNP 2076 m 3621 m 1545 m
NPHI 2076 m 3621 m 1545 m
TNPH 2076 m 3621 m 1545 m

Resistivity (27 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
DI_HRLT 2125 m 3627 m 1502 m
HMIN 2125 m 3623 m 1498 m
HMNO 2125 m 3623 m 1498 m
HTEM 2076 m 3637 m 1561 m
RLA0 2125 m 3627 m 1502 m
RLA1 2125 m 3627 m 1502 m
RLA2 2125 m 3627 m 1502 m
RLA3 2125 m 3627 m 1502 m
RLA4 2125 m 3627 m 1502 m
RLA5 2125 m 3627 m 1502 m
RM_HRLT 2125 m 3627 m 1502 m
RT_HRLT 2125 m 3627 m 1502 m
RXO_HRLT 2125 m 3627 m 1502 m
RXO8 2125 m 3623 m 1498 m
RXOI 2125 m 3622 m 1497 m
RXOZ 2125 m 3623 m 1498 m
SDDE 2126 m 3635 m 1509 m
SEDA 2126 m 3635 m 1509 m
SEDP 2126 m 3635 m 1509 m
SEMA 2126 m 3635 m 1509 m
SEMP 2126 m 3635 m 1509 m
SESA 2126 m 3635 m 1509 m
SESP 2126 m 3635 m 1509 m
SEXA 2126 m 3635 m 1509 m
SEXP 2126 m 3635 m 1509 m
SFXE 2126 m 3635 m 1509 m
STEM 2126 m 3635 m 1509 m

Sonic (7 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DTCO1 2125 m 3615 m 1490 m
DTCO2 2125 m 3615 m 1490 m
DTCO3 2125 m 3615 m 1490 m
DTSH_FAST 2125 m 3615 m 1490 m
DTSH_SLOW 2125 m 3615 m 1490 m
DTSH1 2125 m 3610 m 1485 m
SPHI 2119 m 3636 m 1516 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 2076 m 3637 m 1561 m