Skip to content

Rose 1

Carnarvon, Western Australia

Rose 1 is a petroleum well in the Carnarvon, Western Australia, operated by Apache, drilled to a total depth of 2,643 m.

Request LAS Files & Well Summary

Well Information

Well Name
Rose 1
Basin
Carnarvon
State
Western Australia
Classification
FEST
Operator
Apache
Driller
Reading & Bates
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,643 m
Datum Elevation
30.9 m
Spud Date
08/07/1998
Completion Date
31/07/1998
Permit
WA TL 1

Location

Latitude
-20.5965
Longitude
115.7160

Available Log Data

3
Log Streams
79
Curves
4,005,272
Data Points
83,591
Metres

Other (9 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
AMPE 2315 m 2631 m 315 m
DMA1 2315 m 2630 m 315 m
DMI1 2315 m 2630 m 315 m
DPBD 2315 m 2629 m 314 m
DPFC 2394 m 2571 m 177 m
DQBD 2315 m 2629 m 314 m
DQFC 2394 m 2571 m 177 m
DZBD 2315 m 2629 m 314 m
DZFC 2394 m 2571 m 177 m

Borehole Geometry (6 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
AZIM 2315 m 2631 m 315 m
DEVI 2302 m 2630 m 328 m
DEVI 2315 m 2631 m 315 m
HAZI 2302 m 2630 m 328 m
HAZI 2315 m 2631 m 315 m
TVDD 63 m 2642 m 2579 m

Caliper (10 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 1147 m 2622 m 1475 m
CALI 2302 m 2630 m 328 m
CALI 2302 m 2630 m 328 m
CALI 2302 m 2630 m 328 m
CALI 2315 m 2631 m 315 m
CALI 2315 m 2631 m 315 m
CALI 2315 m 2631 m 315 m
CALI 2315 m 2631 m 315 m
CALI 2315 m 2631 m 315 m
CALI 2315 m 2631 m 315 m

Chromato (12 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 1202 m 2642 m 1440 m
FLOW 63 m 2642 m 2579 m
IBUT 1202 m 2642 m 1440 m
IPEN 1202 m 2642 m 1440 m
MDOU 63 m 2642 m 2579 m
METH 1202 m 2642 m 1440 m
MTIN 63 m 2642 m 2579 m
MTOU 63 m 2642 m 2579 m
MWIN 63 m 2642 m 2579 m
NBUT 1202 m 2642 m 1440 m
NPEN 1202 m 2642 m 1440 m
PROP 1202 m 2642 m 1440 m

Density (4 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DNPH 1194 m 2622 m 1428 m
DRHO 1194 m 2622 m 1428 m
PEF 1194 m 2622 m 1428 m
RHOB 1194 m 2622 m 1428 m

GR (12 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GKUT 2298 m 2548 m 249 m
GR 2298 m 2548 m 249 m
GR 2302 m 2630 m 328 m
GR 2315 m 2631 m 315 m
GRC 282 m 2641 m 2358 m
GRK 2298 m 2548 m 249 m
GRKT 2298 m 2548 m 249 m
GRTH 2298 m 2548 m 249 m
GRUR 2298 m 2548 m 249 m
POTA 2298 m 2548 m 249 m
THOR 2298 m 2548 m 249 m
URAN 2298 m 2548 m 249 m

Miscellaneous (9 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 280 m 2643 m 2362 m
DEPTH 63 m 2642 m 2579 m
DEPTH 2315 m 2631 m 315 m
EDD1 2315 m 2631 m 315 m
EDD2 2315 m 2631 m 315 m
EDD3 2315 m 2631 m 315 m
EDD4 2315 m 2631 m 315 m
EDD5 2315 m 2631 m 315 m
EDD6 2315 m 2631 m 315 m

Mudlog (7 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ROP 297 m 2643 m 2346 m
ROP 63 m 2642 m 2579 m
RPM 63 m 2642 m 2579 m
SPP 63 m 2642 m 2579 m
TGAS 1202 m 2642 m 1440 m
TORQ 63 m 2642 m 2579 m
WOB 63 m 2642 m 2579 m

Neutron (1 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NLIM 1194 m 2622 m 1428 m

Resistivity (5 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
R25A 280 m 2639 m 2359 m
R25P 280 m 2639 m 2359 m
R55A 280 m 2639 m 2359 m
R55P 280 m 2639 m 2359 m
TEMP 2298 m 2555 m 256 m

Sonic (4 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DTSL 2175 m 2614 m 439 m
DTSU 2175 m 2614 m 439 m
FDTL 1194 m 2615 m 1421 m
FDTU 1194 m 2615 m 1421 m