Skip to content

Scarborough 2

Carnarvon, Western Australia

Scarborough 2 is a petroleum well in the Carnarvon, Western Australia, operated by Esso, drilled to a total depth of 2,068 m.

Request LAS Files & Well Summary

Well Information

Well Name
Scarborough 2
Basin
Carnarvon
State
Western Australia
Classification
FAFE
Operator
Esso
Driller
Forwest
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,068 m
Datum Elevation
12.0 m
Spud Date
22/06/1996
Completion Date
08/08/1996
Permit
WA 1 R

Location

Latitude
-19.9049
Longitude
113.1850

Available Log Data

2
Log Streams
41
Curves
157,113
Data Points
23,944
Metres

Other (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GRRA 1791 m 1857 m 66 m
RDM 1790 m 1857 m 66 m
RMM 1790 m 1856 m 66 m
RSM 1790 m 1856 m 66 m

Borehole Geometry (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEVI 1803 m 2061 m 258 m
HAZI 1803 m 2061 m 258 m

Caliper (4 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 982 m 2052 m 1069 m
CALI 1810 m 2060 m 250 m
CALI 1810 m 2060 m 250 m
CALS 982 m 2037 m 1054 m

Chromato (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
MTEM 977 m 2045 m 1067 m

Density (4 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 987 m 2053 m 1065 m
LITH 987 m 2052 m 1065 m
PEF 987 m 2053 m 1065 m
RHOB 987 m 2053 m 1065 m

Dip and Scan (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DDA 1807 m 2059 m 252 m
DDIP 1807 m 2059 m 252 m

GR (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CGR 1803 m 2042 m 238 m
GR 977 m 2032 m 1054 m
SGR 1803 m 2042 m 238 m
THOR 1803 m 2042 m 238 m
URAN 1803 m 2042 m 238 m

Miscellaneous (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 977 m 2062 m 1084 m
DEPTH 1790 m 1859 m 68 m

Mudlog (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ROP 1793 m 1859 m 65 m

Neutron (2 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NPHI 987 m 2048 m 1061 m
TNPH 987 m 2048 m 1061 m

Resistivity (7 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
DI 1810 m 2043 m 233 m
LLD 987 m 2043 m 1056 m
LLS 987 m 2043 m 1056 m
MRES 977 m 2045 m 1067 m
MSFL 987 m 2037 m 1050 m
RESB 1792 m 1858 m 66 m
RESR 1791 m 1857 m 66 m

Sonic (6 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 982 m 1388 m 405 m
DTCO 1336 m 2062 m 726 m
DTL 982 m 1389 m 406 m
DTSM 1336 m 2062 m 726 m
PR 1336 m 2062 m 726 m
VPVS 1336 m 2062 m 726 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 987 m 2025 m 1038 m