Skip to content

Taj 1

Carnarvon, Western Australia

Taj 1 is a petroleum well in the Carnarvon, Western Australia, operated by Woodside, drilled to a total depth of 2,049 m.

Request LAS Files & Well Summary

Well Information

Well Name
Taj 1
Basin
Carnarvon
State
Western Australia
Classification
FEST
Operator
Woodside
Driller
Ensco
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,049 m
Datum Elevation
-
Spud Date
02/02/2006
Completion Date
08/02/2006
Permit
WA 20 L
Rig
Rig 106

Location

Latitude
-19.7014
Longitude
116.7340

Available Log Data

4
Log Streams
52
Curves
385,569
Data Points
84,094
Metres

Other (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DTSDISP 1145 m 2016 m 870 m
TTQ 1145 m 2016 m 870 m

Caliper (1 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALFM 1091 m 2024 m 932 m

Chromato (12 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 118 m 2049 m 1931 m
FLOW 95 m 2049 m 1954 m
IBUT 118 m 2049 m 1931 m
IPEN 118 m 2049 m 1931 m
MDOU 95 m 2049 m 1954 m
METH 118 m 2049 m 1931 m
MTIN 95 m 2049 m 1954 m
MTOU 95 m 2049 m 1954 m
MWIN 95 m 2049 m 1954 m
NBUT 118 m 2049 m 1931 m
NPEN 118 m 2049 m 1931 m
PROP 118 m 2049 m 1931 m

Density (3 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
BDCFM 1140 m 2024 m 884 m
DPEFM 1140 m 2024 m 884 m
DRHFM 1140 m 2024 m 884 m

GR (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GRAFM 99 m 2034 m 1934 m

Miscellaneous (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITD 95 m 2049 m 1954 m
DEPTH 1145 m 2018 m 873 m
DEPTH 95 m 2049 m 1954 m
DEPTH 95 m 2049 m 1954 m
DEPTH 118 m 2049 m 1931 m

Mudlog (12 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITT 95 m 2049 m 1954 m
DXC 95 m 2049 m 1954 m
PITV 95 m 2049 m 1954 m
ROP 95 m 2049 m 1954 m
ROPA 117 m 2048 m 1931 m
ROTT 95 m 2049 m 1954 m
RPM 95 m 2049 m 1954 m
SPP 95 m 2049 m 1954 m
TBR 95 m 2049 m 1954 m
TGAS 118 m 2049 m 1931 m
TORQ 95 m 2049 m 1954 m
WOB 95 m 2049 m 1954 m

Neutron (3 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NFBFM 1089 m 2021 m 932 m
NNBFM 1089 m 2021 m 932 m
NPLFM 1129 m 2021 m 892 m

Resistivity (7 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
RPCEHM 114 m 2033 m 1918 m
RPCELM 114 m 2033 m 1918 m
RPCESHM 114 m 2033 m 1918 m
RPCESLM 114 m 2033 m 1918 m
RPIHM 99 m 2033 m 1934 m
RPTHM 99 m 2033 m 1934 m
TCDM 109 m 2048 m 1938 m

Sonic (6 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DTC 1145 m 2016 m 870 m
DTPM 1140 m 2018 m 878 m
DTS 1145 m 2016 m 870 m
QCS 1145 m 2015 m 870 m
SVPM 1140 m 2018 m 878 m
VPVS 1145 m 2016 m 870 m