Taj 1
Taj 1 is a petroleum well in the Carnarvon, Western Australia, operated by Woodside, drilled to a total depth of 2,049 m.
Well Information
Drilling Data
- Total Depth
- 2,049 m
- Datum Elevation
- -
- Spud Date
- 02/02/2006
- Completion Date
- 08/02/2006
- Permit
- WA 20 L
- Rig
- Rig 106
Location
- Latitude
- -19.7014
- Longitude
- 116.7340
Available Log Data
Other (2 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DTSDISP | 1145 m | 2016 m | 870 m |
| TTQ | 1145 m | 2016 m | 870 m |
Caliper (1 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALFM | 1091 m | 2024 m | 932 m |
Chromato (12 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ETHA | 118 m | 2049 m | 1931 m |
| FLOW | 95 m | 2049 m | 1954 m |
| IBUT | 118 m | 2049 m | 1931 m |
| IPEN | 118 m | 2049 m | 1931 m |
| MDOU | 95 m | 2049 m | 1954 m |
| METH | 118 m | 2049 m | 1931 m |
| MTIN | 95 m | 2049 m | 1954 m |
| MTOU | 95 m | 2049 m | 1954 m |
| MWIN | 95 m | 2049 m | 1954 m |
| NBUT | 118 m | 2049 m | 1931 m |
| NPEN | 118 m | 2049 m | 1931 m |
| PROP | 118 m | 2049 m | 1931 m |
Density (3 curves)
Bulk density measurements for porosity calculation and lithology identification.
| Curve | Start | End | Interval |
|---|---|---|---|
| BDCFM | 1140 m | 2024 m | 884 m |
| DPEFM | 1140 m | 2024 m | 884 m |
| DRHFM | 1140 m | 2024 m | 884 m |
GR (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GRAFM | 99 m | 2034 m | 1934 m |
Miscellaneous (5 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| BITD | 95 m | 2049 m | 1954 m |
| DEPTH | 1145 m | 2018 m | 873 m |
| DEPTH | 95 m | 2049 m | 1954 m |
| DEPTH | 95 m | 2049 m | 1954 m |
| DEPTH | 118 m | 2049 m | 1931 m |
Mudlog (12 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| BITT | 95 m | 2049 m | 1954 m |
| DXC | 95 m | 2049 m | 1954 m |
| PITV | 95 m | 2049 m | 1954 m |
| ROP | 95 m | 2049 m | 1954 m |
| ROPA | 117 m | 2048 m | 1931 m |
| ROTT | 95 m | 2049 m | 1954 m |
| RPM | 95 m | 2049 m | 1954 m |
| SPP | 95 m | 2049 m | 1954 m |
| TBR | 95 m | 2049 m | 1954 m |
| TGAS | 118 m | 2049 m | 1931 m |
| TORQ | 95 m | 2049 m | 1954 m |
| WOB | 95 m | 2049 m | 1954 m |
Neutron (3 curves)
Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.
| Curve | Start | End | Interval |
|---|---|---|---|
| NFBFM | 1089 m | 2021 m | 932 m |
| NNBFM | 1089 m | 2021 m | 932 m |
| NPLFM | 1129 m | 2021 m | 892 m |
Resistivity (7 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| RPCEHM | 114 m | 2033 m | 1918 m |
| RPCELM | 114 m | 2033 m | 1918 m |
| RPCESHM | 114 m | 2033 m | 1918 m |
| RPCESLM | 114 m | 2033 m | 1918 m |
| RPIHM | 99 m | 2033 m | 1934 m |
| RPTHM | 99 m | 2033 m | 1934 m |
| TCDM | 109 m | 2048 m | 1938 m |
Sonic (6 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DTC | 1145 m | 2016 m | 870 m |
| DTPM | 1140 m | 2018 m | 878 m |
| DTS | 1145 m | 2016 m | 870 m |
| QCS | 1145 m | 2015 m | 870 m |
| SVPM | 1140 m | 2018 m | 878 m |
| VPVS | 1145 m | 2016 m | 870 m |