Skip to content

Thebe 1

Carnarvon, Western Australia

Thebe 1 is a petroleum well in the Carnarvon, Western Australia, operated by BHP, drilled to a total depth of 2,510 m.

Request LAS Files & Well Summary

Well Information

Well Name
Thebe 1
Basin
Carnarvon
State
Western Australia
Classification
FEST
Operator
BHP
Driller
Atwood
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,510 m
Datum Elevation
22.3 m
Spud Date
07/07/2007
Completion Date
08/08/2007
Permit
WA 346 P

Location

Latitude
-19.4235
Longitude
113.0890

Available Log Data

13
Log Streams
187
Curves
1,023,177
Data Points
118,278
Metres

Other (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CHR_YD 1751 m 2479 m 727 m
CHT_YD 1743 m 2426 m 683 m
DT_YD_R 1751 m 2479 m 727 m
DT_YD_T 1743 m 2426 m 683 m

Borehole Geometry (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEVI 1891 m 2435 m 544 m
HAZI 1891 m 2435 m 544 m
P1AZ 1891 m 2435 m 544 m
RB 1891 m 2435 m 544 m

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
HDAR 1906 m 2427 m 521 m
HDAR 1906 m 2493 m 587 m

Chromato (22 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 1906 m 2427 m 521 m
ETHA 1964 m 2450 m 486 m
ETHA 1925 m 2510 m 585 m
IBUT 1964 m 2450 m 486 m
IBUT 1925 m 2510 m 585 m
IPEN 1964 m 2450 m 486 m
IPEN 1925 m 2510 m 585 m
MDOU 1964 m 2450 m 486 m
MDOU 1192 m 2510 m 1318 m
METH 1906 m 2427 m 521 m
METH 1964 m 2450 m 486 m
METH 1925 m 2510 m 585 m
MTIN 1964 m 2450 m 486 m
MTIN 1192 m 2510 m 1318 m
MTOU 1964 m 2450 m 486 m
MTOU 1192 m 2510 m 1318 m
NBUT 1964 m 2450 m 486 m
NBUT 1925 m 2510 m 585 m
NPEN 1964 m 2450 m 486 m
NPEN 1925 m 2510 m 585 m
PROP 1964 m 2450 m 486 m
PROP 1925 m 2510 m 585 m

CMR (28 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BFV 2189 m 2506 m 316 m
CBF1 2189 m 2506 m 316 m
CBF2 2189 m 2506 m 316 m
CBF3 2189 m 2506 m 316 m
CBF4 2189 m 2506 m 316 m
CBF5 2189 m 2506 m 316 m
CBF6 2189 m 2506 m 316 m
CBF7 2189 m 2506 m 316 m
CBP1 2189 m 2506 m 316 m
CBP2 2189 m 2506 m 316 m
CBP3 2189 m 2506 m 316 m
CBP4 2189 m 2506 m 316 m
CBP5 2189 m 2506 m 316 m
CBP6 2189 m 2506 m 316 m
CBP7 2189 m 2506 m 316 m
CBP8 2189 m 2506 m 316 m
CFF1 2189 m 2506 m 316 m
CFF2 2189 m 2506 m 316 m
CFF3 2189 m 2506 m 316 m
CFF4 2189 m 2506 m 316 m
CFF5 2189 m 2506 m 316 m
CFF6 2189 m 2506 m 316 m
CFF7 2189 m 2506 m 316 m
CMFF 2189 m 2506 m 316 m
KSDR 2189 m 2506 m 316 m
KTIM 2189 m 2506 m 316 m
T2CUTOFF 2189 m 2506 m 316 m
TCMR 2189 m 2506 m 316 m

Density (14 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DSO8 1909 m 2492 m 583 m
DSOZ 1909 m 2492 m 583 m
HDRA 1909 m 2414 m 505 m
HDRA 1909 m 2492 m 583 m
HPRA 1909 m 2414 m 505 m
HPRA 1909 m 2492 m 583 m
PEF8 1909 m 2414 m 505 m
PEF8 1909 m 2492 m 583 m
PEFZ 1909 m 2414 m 505 m
PEFZ 1909 m 2492 m 583 m
RHO8 1909 m 2414 m 505 m
RHO8 1909 m 2492 m 583 m
RHOZ 1909 m 2414 m 505 m
RHOZ 1909 m 2492 m 583 m

Dip and Scan (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DDA 1916 m 2427 m 511 m
DDIP 1916 m 2427 m 511 m
DPAZ 1916 m 2427 m 511 m
DPTR 1916 m 2427 m 511 m
QUAF 1909 m 2427 m 518 m

GR (10 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR 1891 m 2410 m 519 m
ECGR 1634 m 2488 m 854 m
EHGR 1891 m 2409 m 518 m
EHGR 1634 m 2488 m 854 m
GR 1891 m 2410 m 519 m
GR 1634 m 2488 m 854 m
GR_ARC 1248 m 2493 m 1245 m
GRM1 1928 m 2248 m 320 m
HGR 1891 m 2409 m 518 m
HGR 1634 m 2488 m 854 m

Logging Parameters (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CS 1634 m 2503 m 869 m
TENS 1634 m 2502 m 868 m

Miscellaneous (17 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITD 1964 m 2450 m 486 m
BITD 1192 m 2510 m 1318 m
DEPTH 1964 m 2450 m 486 m
DEPTH 1891 m 2435 m 544 m
DEPTH 1891 m 2435 m 544 m
DEPTH 1891 m 2435 m 544 m
DEPTH 1964 m 2450 m 486 m
DEPTH 1928 m 2263 m 335 m
DEPTH 2189 m 2506 m 316 m
DEPTH 1925 m 2510 m 585 m
DEPTH 1248 m 2510 m 1262 m
DEPTH 1634 m 2506 m 871 m
DEPTH 1738 m 2498 m 760 m
DEPTH 1634 m 2506 m 871 m
DEPTH 1192 m 2510 m 1318 m
MFIN 1964 m 2450 m 486 m
MFIN 1192 m 2510 m 1318 m

Mudlog (29 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
APRS_ARC 1248 m 2494 m 1246 m
ATMP 1248 m 2494 m 1246 m
BITH 1964 m 2450 m 486 m
BITH 1192 m 2510 m 1318 m
DXC 1964 m 2450 m 486 m
DXC 1192 m 2510 m 1318 m
ECD_ARC 1248 m 2494 m 1246 m
MDIN 1964 m 2450 m 486 m
MDIN 1192 m 2510 m 1318 m
PITV 1964 m 2450 m 486 m
PITV 1192 m 2510 m 1318 m
ROP 1964 m 2450 m 486 m
ROP 1192 m 2510 m 1318 m
ROP5 1928 m 2263 m 335 m
ROP5_RM 1248 m 2508 m 1260 m
ROTT 1964 m 2450 m 486 m
ROTT 1192 m 2510 m 1318 m
RPM 1964 m 2450 m 486 m
RPM 1192 m 2510 m 1318 m
SPP 1964 m 2450 m 486 m
SPP 1192 m 2510 m 1318 m
TGAS 1964 m 2450 m 486 m
TGAS 1925 m 2510 m 585 m
TORQ 1964 m 2450 m 486 m
TORQ 1192 m 2510 m 1318 m
TREV 1964 m 2450 m 486 m
TREV 1192 m 2510 m 1318 m
WOB 1964 m 2450 m 486 m
WOB 1192 m 2510 m 1318 m

Neutron (8 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
HNPO 1891 m 2411 m 520 m
HNPO 1634 m 2490 m 856 m
HTNP 1891 m 2411 m 520 m
HTNP 1634 m 2490 m 856 m
NPHI 1891 m 2411 m 520 m
NPHI 1634 m 2491 m 857 m
TNPH 1891 m 2411 m 520 m
TNPH 1634 m 2491 m 857 m

Resistivity (32 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
DI_HRLT 1909 m 2419 m 510 m
HMIN 1909 m 2414 m 505 m
HMIN 1909 m 2492 m 583 m
HMNO 1909 m 2414 m 505 m
HMNO 1909 m 2492 m 583 m
HTEM 1891 m 2409 m 518 m
P16H 1248 m 2493 m 1245 m
P28H 1248 m 2493 m 1245 m
P40H 1248 m 2493 m 1245 m
RLA0 1909 m 2414 m 505 m
RLA0 1909 m 2492 m 583 m
RLA1 1909 m 2414 m 505 m
RLA1 1909 m 2492 m 583 m
RLA2 1909 m 2414 m 505 m
RLA2 1909 m 2492 m 583 m
RLA3 1909 m 2414 m 505 m
RLA3 1909 m 2492 m 583 m
RLA4 1909 m 2414 m 505 m
RLA4 1909 m 2492 m 583 m
RLA5 1909 m 2414 m 505 m
RLA5 1909 m 2492 m 583 m
RM_HRLT 1909 m 2414 m 505 m
RM_HRLT 1905 m 2492 m 587 m
RSO8 1909 m 2492 m 583 m
RSOZ 1909 m 2492 m 583 m
RT_HRLT 1909 m 2419 m 510 m
RXO_HRLT 1909 m 2419 m 510 m
RXO8 1909 m 2414 m 505 m
RXO8 1909 m 2492 m 583 m
RXOZ 1909 m 2414 m 505 m
RXOZ 1909 m 2492 m 583 m
TAB 1248 m 2493 m 1245 m

Sonic (8 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
CHRP 1907 m 2479 m 571 m
CHTP 1909 m 2479 m 569 m
DTCO 1907 m 2480 m 572 m
DTRP 1907 m 2479 m 571 m
DTSM 1743 m 2479 m 735 m
DTTP 1909 m 2479 m 569 m
PR 1907 m 2479 m 571 m
VPVS 1907 m 2479 m 571 m

SP (2 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 1909 m 2411 m 502 m
SP 1909 m 2487 m 578 m