Skip to content

Frankland 2

Perth, Western Australia

Frankland 2 is a petroleum well in the Perth, Western Australia, operated by Roc, drilled to a total depth of 2,330 m.

Request LAS Files & Well Summary

Well Information

Well Name
Frankland 2
Basin
Perth
State
Western Australia
Classification
FEST
Operator
Roc
Driller
Peak Group
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,330 m
Datum Elevation
30.6 m
Spud Date
12/02/2008
Completion Date
09/03/2008
Permit
WA 286P
Rig
Wilcraft

Location

Latitude
-29.2468
Longitude
114.7437

Available Log Data

7
Log Streams
70
Curves
870,924
Data Points
108,863
Metres

Borehole Geometry (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
TVD 1021 m 2248 m 1227 m

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
HCAL 1020 m 2310 m 1290 m
HDAR 1020 m 2310 m 1290 m

Chromato (11 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 1031 m 2330 m 1298 m
FLIN 100 m 2330 m 2230 m
IBUT 1031 m 2330 m 1298 m
IPEN 1031 m 2330 m 1298 m
MDOU 100 m 2330 m 2230 m
METH 1031 m 2330 m 1298 m
MTIN 100 m 2330 m 2230 m
MTOU 100 m 2330 m 2230 m
NBUT 1031 m 2330 m 1298 m
NPEN 1031 m 2330 m 1298 m
PROP 1031 m 2330 m 1298 m

Density (5 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DSOZ 1026 m 2311 m 1285 m
HDRA 1026 m 2311 m 1285 m
HPRA 1026 m 2311 m 1285 m
PEFZ 1026 m 2311 m 1285 m
RHOZ 1026 m 2311 m 1285 m

GR (6 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR 1020 m 2307 m 1287 m
EHGR 980 m 2307 m 1326 m
GR 70 m 2307 m 2236 m
GR 1020 m 2307 m 1287 m
HGR 980 m 2307 m 1326 m
SGRC 1021 m 2245 m 1223 m

Logging Parameters (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
TENS 70 m 2324 m 2254 m
TENS 980 m 2324 m 1344 m

Miscellaneous (8 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITD 100 m 2330 m 2230 m
DEPT 1031 m 2330 m 1298 m
DEPT 980 m 2317 m 1337 m
DEPT 70 m 2324 m 2254 m
DEPT 980 m 2324 m 1344 m
DEPT 1020 m 2310 m 1290 m
DEPT 1021 m 2248 m 1227 m
DEPT 100 m 2330 m 2230 m

Mudlog (13 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITT 100 m 2330 m 2230 m
DXC 100 m 2330 m 2230 m
MDIN 100 m 2330 m 2230 m
PVT 100 m 2330 m 2230 m
ROP 100 m 2330 m 2230 m
ROTT 100 m 2330 m 2230 m
RPMB 100 m 2330 m 2230 m
SPP 100 m 2330 m 2230 m
SROP 1028 m 2248 m 1220 m
TGAS 1031 m 2330 m 1298 m
TORQ 100 m 2330 m 2230 m
TREV 100 m 2330 m 2230 m
WOB 100 m 2330 m 2230 m

Neutron (4 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
HNPO 980 m 2309 m 1329 m
HTNP 980 m 2309 m 1329 m
NPHI 980 m 2309 m 1329 m
TNPH 980 m 2309 m 1329 m

Resistivity (14 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
HART 1026 m 2317 m 1291 m
HDI 1026 m 2317 m 1291 m
HLLD 1026 m 2317 m 1291 m
HLLG 1026 m 2317 m 1291 m
HLLS 1026 m 2317 m 1291 m
HMIN 1026 m 2309 m 1283 m
HMNO 1026 m 2309 m 1283 m
HRM 1026 m 2317 m 1291 m
SEDP 1027 m 2242 m 1214 m
SEMP 1027 m 2242 m 1214 m
SESP 1027 m 2242 m 1214 m
SEXP 1027 m 2242 m 1214 m
SFXE 1028 m 2242 m 1214 m
STEM 1021 m 2243 m 1222 m

Sonic (2 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 1020 m 2315 m 1295 m
DTL 1020 m 2315 m 1295 m

SP (2 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 1026 m 2297 m 1271 m
SPF 1026 m 2297 m 1271 m