Skip to content

Warro 3

Perth, Western Australia

Warro 3 is a petroleum well in the Perth, Western Australia, operated by Latent, drilled to a total depth of 4,280 m.

Request LAS Files & Well Summary

Well Information

Well Name
Warro 3
Basin
Perth
State
Western Australia
Classification
NDFD
Operator
Latent
Driller
Weatherford
Data Summary
Partial WDS Available

Drilling Data

Total Depth
4,280 m
Datum Elevation
297.1 m
Spud Date
30/01/2009
Completion Date
20/03/2009
Permit
WA EP 407

Location

Latitude
-30.1780
Longitude
115.7367

Available Log Data

4
Log Streams
61
Curves
1,951,066
Data Points
203,798
Metres

Caliper (1 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
HCAL 1485 m 4286 m 2801 m

Chromato (9 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 65 m 4280 m 4215 m
FLIN 65 m 4280 m 4215 m
H2S 65 m 4279 m 4214 m
IBUT 65 m 4280 m 4215 m
IPEN 65 m 4280 m 4215 m
METH 65 m 4280 m 4215 m
NBUT 65 m 4280 m 4215 m
NPEN 65 m 4280 m 4215 m
PROP 65 m 4280 m 4215 m

Density (6 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DPHZ 1487 m 3683 m 2196 m
DSOZ 1487 m 4289 m 2801 m
HDRA 1487 m 4289 m 2801 m
HPRA 1487 m 3683 m 2196 m
PEFZ 1487 m 4289 m 2801 m
RHOZ 1487 m 4289 m 2801 m

GR (6 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR 99 m 4281 m 4181 m
ECGR_EDTC 99 m 4274 m 4174 m
EHGR 600 m 3679 m 3079 m
GR 99 m 4281 m 4181 m
GR_EDTC 99 m 3678 m 3578 m
HGR 600 m 3679 m 3079 m

Logging Parameters (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CS 99 m 3700 m 3600 m
TENS 99 m 3700 m 3600 m

Miscellaneous (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPT 65 m 4280 m 4215 m
DEPT 99 m 4281 m 4181 m
DEPT 100 m 4290 m 4189 m
DEPT 65 m 4280 m 4215 m

Mudlog (10 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DXC 65 m 4280 m 4215 m
RETD 65 m 4280 m 4215 m
ROP 65 m 4280 m 4215 m
RPMB 65 m 4280 m 4215 m
RPMS 65 m 4280 m 4215 m
SPP 65 m 4280 m 4215 m
TGAS 65 m 4279 m 4214 m
TORQ 65 m 4280 m 4215 m
TQMX 65 m 4280 m 4215 m
WOB 65 m 4280 m 4215 m

Neutron (4 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
HNPO 600 m 3680 m 3080 m
HTNP 600 m 3680 m 3080 m
NPHI 600 m 3680 m 3080 m
TNPH 600 m 4290 m 3690 m

Resistivity (16 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
DI_HRLT 1487 m 3683 m 2196 m
HMIN 1487 m 4290 m 2803 m
HMIN1 3575 m 4290 m 715 m
HMNO 1487 m 4290 m 2803 m
HMNO1 3575 m 4290 m 715 m
RLA1 1487 m 4290 m 2803 m
RLA2 1487 m 4290 m 2803 m
RLA3 1487 m 4290 m 2803 m
RLA4 1487 m 4290 m 2803 m
RLA5 1487 m 4290 m 2803 m
RM_HRLT 1487 m 3683 m 2196 m
RSOZ 3575 m 4290 m 715 m
RT_HRLT 1487 m 4290 m 2803 m
RXO_HRLT 1487 m 4290 m 2803 m
RXO8 100 m 3683 m 3582 m
RXOZ 100 m 3683 m 3582 m

Sonic (3 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 1497 m 4275 m 2778 m
DTL 1497 m 3689 m 2192 m
SPHI 1498 m 3689 m 2191 m