Digital Wireline Logs for Wilga Park 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Wilga Park 1 in the Gunnedah, New South Wales, operated by Hartogen, drilled to a total depth of 796 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 796 m
- Datum Elevation
- 224.6 m
- Spud Date
- 30/06/1985
- Completion Date
- 16/07/1985
- Permit
- -
Location
- Latitude
- -30.3622
- Longitude
- 149.6650