Digital Wireline Logs for Ooraminna 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Ooraminna 2 in the Amadeus, Northern Territory, operated by Central, drilled to a total depth of 1,821 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,821 M
- Datum Elevation
- -
- Spud Date
- 11/06/2010
- Completion Date
- 13/07/2010
- Permit
- EP 82
- Rig
- Rig 7
Location
- Latitude
- -24.0183
- Longitude
- 134.1700