Digital Wireline Logs for Palm Valley 5
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Palm Valley 5 in the Amadeus, Northern Territory, operated by Magellan, drilled to a total depth of 2,276 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,276 m
- Datum Elevation
- -
- Spud Date
- 17/02/1985
- Completion Date
- 07/04/1985
- Permit
- -
Location
- Latitude
- -24.0708
- Longitude
- 132.8500