Arcadia Branch 1
Workstation-Ready Wireline Logs (LAS) & Data Summaries
Quality-controlled, spliced, and depth-matched wireline log data for Arcadia Branch 1 in the Bowen, Queensland, operated by Tipperary, drilled to a total depth of 764 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 764 m
- Datum Elevation
- -
- Spud Date
- 29/05/2002
- Completion Date
- 14/06/2002
- Permit
- EPP 526
- Rig
- -
Location
- Latitude
- -25.2908
- Longitude
- 148.9370