Cabawin East 1
Cabawin East 1 is a petroleum well in the Bowen, Queensland, operated by Union, drilled to a total depth of 3,685 m.
Well Information
Drilling Data
- Total Depth
- 3,685 m
- Datum Elevation
- 307.8 m
- Spud Date
- 18/07/1981
- Completion Date
- 17/10/1961
- Permit
- ATP 57 P
- Rig
- National 80B
Location
- Latitude
- -27.4861
- Longitude
- 150.2540
Available Log Data
Caliper (1 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALI | 2065 m | 3683 m | 1618 m |
Miscellaneous (2 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPT | 0 m | 3685 m | 3685 m |
| DEPT | 600 m | 3690 m | 3089 m |
Mudlog (2 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ROP | 0 m | 3685 m | 3685 m |
| TGAS | 783 m | 3684 m | 2901 m |
Resistivity (3 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| LAT | 606 m | 3687 m | 3081 m |
| LN | 601 m | 3687 m | 3085 m |
| SN | 601 m | 3687 m | 3086 m |
Sonic (1 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DT | 601 m | 3684 m | 3082 m |
SP (1 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SP | 600 m | 3690 m | 3089 m |