Digital Wireline Logs for CH4 Grosvenor 11
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 Grosvenor 11 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 319 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 319 m
- Datum Elevation
- -
- Spud Date
- 25/08/2001
- Completion Date
- 28/08/2001
- Permit
- EPP 364
- Rig
- -
Location
- Latitude
- -21.9442
- Longitude
- 148.0260