Digital Wireline Logs for CH4 Grosvenor 27
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 Grosvenor 27 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 250 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 250 m
- Datum Elevation
- -
- Spud Date
- 31/10/2001
- Completion Date
- 03/11/2001
- Permit
- PL 191
- Rig
- -
Location
- Latitude
- -21.9800
- Longitude
- 148.0130