Digital Wireline Logs for CH4 Grosvenor 29
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 Grosvenor 29 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 170 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 170 m
- Datum Elevation
- 230.3 m
- Spud Date
- 20/11/2002
- Completion Date
- 22/11/2002
- Permit
- PL 191
- Rig
- Warman 1000
Location
- Latitude
- -21.9614
- Longitude
- 148.0080