Digital Wireline Logs for CH4 Grosvenor 30
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 Grosvenor 30 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 187 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 187 m
- Datum Elevation
- -
- Spud Date
- 07/11/2001
- Completion Date
- 08/11/2001
- Permit
- PL 191
- Rig
- -
Location
- Latitude
- -21.9611
- Longitude
- 148.0090