Digital Wireline Logs for CH4 Grosvenor 39
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 Grosvenor 39 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 147 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 147 m
- Datum Elevation
- 221.4 m
- Spud Date
- 22/12/2002
- Completion Date
- 23/12/2002
- Permit
- PL 191
- Rig
- Warman 1000
Location
- Latitude
- -21.9772
- Longitude
- 148.0470