Digital Wireline Logs for CH4 Grosvenor 40
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 Grosvenor 40 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 254 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 254 m
- Datum Elevation
- 213.0 m
- Spud Date
- 10/08/2003
- Completion Date
- 14/08/2003
- Permit
- ATP 364 P
- Rig
- Edson 6000W
Location
- Latitude
- -22.0170
- Longitude
- 148.0950