Digital Wireline Logs for CH4 Grosvenor 41
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 Grosvenor 41 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 354 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 354 m
- Datum Elevation
- 209.1 m
- Spud Date
- 03/08/2003
- Completion Date
- 09/08/2003
- Permit
- ATP 364 P
- Rig
- Edson 6000W
Location
- Latitude
- -22.0344
- Longitude
- 148.1130