Digital Wireline Logs for CH4 Grosvenor 46
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 Grosvenor 46 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 312 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 312 m
- Datum Elevation
- 212.4 m
- Spud Date
- 26/04/2004
- Completion Date
- 01/05/2004
- Permit
- PL 196
- Rig
- UDR 650
Location
- Latitude
- -22.0370
- Longitude
- 148.0960