Digital Wireline Logs for CH4 Grosvenor 4A
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 Grosvenor 4A in the Bowen, Queensland, operated by CH4, drilled to a total depth of 320 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 320 m
- Datum Elevation
- -
- Spud Date
- 14/10/2000
- Completion Date
- 24/10/2000
- Permit
- EPP 364
- Rig
- -
Location
- Latitude
- -21.9633
- Longitude
- 148.0320