Skip to content

Digital Wireline Logs for CH4 Grosvenor 50

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Bowen, Queensland

Quality-controlled, spliced, and depth-matched wireline log data for CH4 Grosvenor 50 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 402 m. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
CH4 Grosvenor 50
Basin
Bowen
State
Queensland
Classification
CBM
Operator
CH4
Driller
Depco

Drilling Data

Total Depth
402 m
Datum Elevation
209.5 m
Spud Date
11/03/2005
Completion Date
17/03/2005
Permit
PL 196
Rig
UDR 650

Location

Latitude
-22.0313
Longitude
148.1080