Skip to content

Digital Wireline Logs for CH4 Grosvenor 58

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Bowen, Queensland

Quality-controlled, spliced, and depth-matched wireline log data for CH4 Grosvenor 58 in the Bowen, Queensland, operated by Arrow, drilled to a total depth of 540 m. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
CH4 Grosvenor 58
Basin
Bowen
State
Queensland
Classification
CBM
Operator
Arrow
Driller
Depco

Drilling Data

Total Depth
540 m
Datum Elevation
250.4 m
Spud Date
30/05/2007
Completion Date
31/07/2007
Permit
PL 191
Rig
UDR 1200

Location

Latitude
-21.8626
Longitude
148.0640