Digital Wireline Logs for CH4 Peak Downs 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 Peak Downs 3 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 326 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 326 m
- Datum Elevation
- 230.6 m
- Spud Date
- 30/08/2004
- Completion Date
- 04/09/2004
- Permit
- ATP 364 P
- Rig
- Edson 6000W
Location
- Latitude
- -22.0704
- Longitude
- 148.1150