Digital Wireline Logs for CH4 Peak Downs 4
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 Peak Downs 4 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 394 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 394 m
- Datum Elevation
- 225.4 m
- Spud Date
- 13/11/2003
- Completion Date
- 24/11/2003
- Permit
- ATP 364 P
- Rig
- Warman 1000
Location
- Latitude
- -22.0849
- Longitude
- 148.1260