Digital Wireline Logs for CH4 Peak Downs 5
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 Peak Downs 5 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 330 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 330 m
- Datum Elevation
- 210.1 m
- Spud Date
- 16/11/2003
- Completion Date
- 22/11/2003
- Permit
- ATP 364 P
- Rig
- Warman 1000
Location
- Latitude
- -22.1007
- Longitude
- 148.1350