Skip to content

Digital Wireline Logs for CH4 Red Hill 2

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Bowen, Queensland

Quality-controlled, spliced, and depth-matched wireline log data for CH4 Red Hill 2 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 336 m. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
CH4 Red Hill 2
Basin
Bowen
State
Queensland
Classification
CBM
Operator
CH4
Driller
Phoenix

Drilling Data

Total Depth
336 m
Datum Elevation
276.5 m
Spud Date
26/11/2003
Completion Date
10/11/2003
Permit
ATP 364

Location

Latitude
-21.7036
Longitude
148.0070