Skip to content

Digital Wireline Logs for CH4 Red Hill 5

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Bowen, Queensland

Quality-controlled, spliced, and depth-matched wireline log data for CH4 Red Hill 5 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 207 m. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
CH4 Red Hill 5
Basin
Bowen
State
Queensland
Classification
CBM
Operator
CH4
Driller
Phoenix

Drilling Data

Total Depth
207 m
Datum Elevation
299.1 m
Spud Date
21/12/2003
Completion Date
25/12/2003
Permit
ATP 364

Location

Latitude
-21.7691
Longitude
148.0790