Digital Wireline Logs for CH4 Red Hill 5
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 Red Hill 5 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 207 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 207 m
- Datum Elevation
- 299.1 m
- Spud Date
- 21/12/2003
- Completion Date
- 25/12/2003
- Permit
- ATP 364
- Rig
- Edson 6000W
Location
- Latitude
- -21.7691
- Longitude
- 148.0790