Digital Wireline Logs for CH4 South Walker 8
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for CH4 South Walker 8 in the Bowen, Queensland, operated by CH4, drilled to a total depth of 400 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 400 m
- Datum Elevation
- 266.5 m
- Spud Date
- 14/06/2005
- Completion Date
- 17/06/2005
- Permit
- ATP 364
- Rig
- UDR 1200
Location
- Latitude
- -21.8046
- Longitude
- 148.3470