Digital Wireline Logs for Dawson River 10
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Dawson River 10 in the Bowen, Queensland, operated by Conoco, drilled to a total depth of 1,362 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,362 m
- Datum Elevation
- 129.1 m
- Spud Date
- 28/01/1995
- Completion Date
- 30/07/1995
- Permit
- ATP 564 P
- Rig
- Rig 23
Location
- Latitude
- -24.8014
- Longitude
- 149.9730