Digital Wireline Logs for Mandalay 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Mandalay 1 in the Bowen, Queensland, operated by OCA, drilled to a total depth of 1,600 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,600 m
- Datum Elevation
- 238.5 m
- Spud Date
- 03/04/1998
- Completion Date
- 17/04/1998
- Permit
- -
- Rig
- Rig 1
Location
- Latitude
- -27.1808
- Longitude
- 148.9220