Digital Wireline Logs for Merivale 9
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Merivale 9 in the Bowen, Queensland, operated by OCA, drilled to a total depth of 1,569 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,569 m
- Datum Elevation
- 558.3 m
- Spud Date
- 09/03/2000
- Completion Date
- 26/03/2000
- Permit
- PL 44
- Rig
- Workover Rig 4
Location
- Latitude
- -25.5508
- Longitude
- 148.3330