Digital Wireline Logs for North Annabelle 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for North Annabelle 1 in the Bowen, Queensland, operated by BHP, drilled to a total depth of 1,508 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,508 m
- Datum Elevation
- 233.0 m
- Spud Date
- 04/03/1985
- Completion Date
- 19/03/1985
- Permit
- -
Location
- Latitude
- -27.3611
- Longitude
- 148.7230