Digital Wireline Logs for Renlim 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Renlim 2 in the Bowen, Queensland, operated by Bridge, drilled to a total depth of 2,000 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,000 m
- Datum Elevation
- 292.0 m
- Spud Date
- 17/09/1983
- Completion Date
- 05/10/1983
- Permit
- -
- Rig
- Ideco H25 Rig 12
Location
- Latitude
- -27.6211
- Longitude
- 149.1540