Digital Wireline Logs for Shingle Hut 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Shingle Hut 1 in the Bowen, Queensland, operated by Coho, drilled to a total depth of 622 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 622 m
- Datum Elevation
- -
- Spud Date
- 07/02/1987
- Completion Date
- 11/02/1987
- Permit
- -
- Rig
- Cabot Rig 3
Location
- Latitude
- -26.2976
- Longitude
- 150.2600